ALPINE ENERGY LIMITED
ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS
Pursuant to Regulation 15 and Part III of the First Schedule of the Electricity (Information Disclosure) Regulations 1994:
-
Energy Delivery Efficiency Performance Measures and Statistics
(a) Load Factor
65.26%
(b) Loss Ratio
5.13%
(c) Capacity Utilisation
31.35%
-
Statistics
(a) System Length (km) Underground (c) Overhead (b) Total > 11kV 3 301 304 11kV 152 2,433 2,585 < 11kV 205 346 551 Total 360 3,080 3,440 (d) Transformer Capacity
250,000 kVA
(e) Maximum Demand
78,370 kW
(f) Electricity Supplied
425 GWH
(g) Electricity Conveyed for Unrelated Parties
100 GWH
(h) Total Customers at 31/3/95
27,100
RELIABILITY PERFORMANCE MEASURES
Pursuant to Regulation 16 and Part IV of the First Schedule of the Electricity (Information Disclosure) Regulations 1994:
-
Number of Interruptions:
- Class A: 4
- Class B: 22
- Class C: 106 (Includes an estimate of 3 U/G)
- Class D: 1
- Total: 133
-
Faults/100km
3.08
-
Faults/100km U/G
0.83 (Assumes all 11kV)
-
Faults/100km O/H
3.34 (Assumes all 11kV)
| A | B | C | D | Total | |
|---|---|---|---|---|---|
| 5,6 | SAIDI | 54 | 19 | 66 | 1 |
| 7,8 | SAIFI | 0.19 | 0.14 | 1.1 | 0.03 |
| 9,10 | CAIDI | 280 | 129 | 60 | 40 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 82
NZLII —
NZ Gazette 1995, No 82
β¨ LLM interpretation of page content
π
Alpine Energy Limited Performance Measures and Statistics
(continued from previous page)
π Trade, Customs & IndustryEnergy Delivery Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Transformer Capacity, Maximum Demand, Electricity Supplied, Electricity Conveyed, Total Customers, Reliability Performance, Interruptions, Faults, SAIDI, SAIFI, CAIDI