ALPINE ENERGY LIMITED

ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

Pursuant to Regulation 15 and Part III of the First Schedule of the Electricity (Information Disclosure) Regulations 1994:

  1. Energy Delivery Efficiency Performance Measures and Statistics

    (a) Load Factor

    65.26%

    (b) Loss Ratio

    5.13%

    (c) Capacity Utilisation

    31.35%

  2. Statistics

    (a) System Length (km) Underground (c) Overhead (b) Total
    > 11kV 3 301 304
    11kV 152 2,433 2,585
    < 11kV 205 346 551
    Total 360 3,080 3,440

    (d) Transformer Capacity

    250,000 kVA

    (e) Maximum Demand

    78,370 kW

    (f) Electricity Supplied

    425 GWH

    (g) Electricity Conveyed for Unrelated Parties

    100 GWH

    (h) Total Customers at 31/3/95

    27,100

RELIABILITY PERFORMANCE MEASURES

Pursuant to Regulation 16 and Part IV of the First Schedule of the Electricity (Information Disclosure) Regulations 1994:

  1. Number of Interruptions:

    • Class A: 4
    • Class B: 22
    • Class C: 106 (Includes an estimate of 3 U/G)
    • Class D: 1
    • Total: 133
  2. Faults/100km

    3.08

  3. Faults/100km U/G

    0.83 (Assumes all 11kV)

  4. Faults/100km O/H

    3.34 (Assumes all 11kV)

A B C D Total
5,6 SAIDI 54 19 66 1
7,8 SAIFI 0.19 0.14 1.1 0.03
9,10 CAIDI 280 129 60 40


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 82


NZLII PDF NZ Gazette 1995, No 82





✨ LLM interpretation of page content

🏭 Alpine Energy Limited Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Transformer Capacity, Maximum Demand, Electricity Supplied, Electricity Conveyed, Total Customers, Reliability Performance, Interruptions, Faults, SAIDI, SAIFI, CAIDI