✨ PowerNet Line Charges




NEW ZEALAND GAZETTE

No. 118

TABLE 20 (cont)

09:51 PM 12/09/95

PowerNet Line Charges 1994/95

Schedule 7

Customer Size Premises Number of Connections Daytime Energy kWh Trans Power Charge PowerNet Charge Total Line Charge per Methodology Approved 1994/95 Line Charge Fixed Charge $ per annum Variable Charge $/Daytime kWh
up to 1kVA Streetlights TPC URBAN 3,500 ... $2 $4 $6 $6 $6 $0.11
TPC RURAL 1,311 ... $2 $8 $11 $11 $15 $0.11
TPC REMOTE RURAL 0 ... $4 $22 $26 $26 ... $0.15
up to 20 kVA TPC URBAN 7,726 41,378,923 $119 $121 $240 $359 $403 $0.034
TPC RURAL 16,790 102,737,867 $119 $307 $426 $503 $220 $0.034
TPC REMOTE RURAL 214 1,507,979 $113 $612 $725 $440 ... $0.034
up to 50kVA TPC URBAN 492 4,762,146 $255 $270 $795 $914 $457 $0.054
TPC RURAL 4,340 18,815,931 $375 $688 $1,063 $1,026 $513 $0.054
TPC REMOTE RURAL 21 150,453 $375 $1,516 $1,892 $1,122 ... $0.054
up to 75kVA TPC URBAN 151 4,871,844 $557 $590 $1,546 $1,855 $928 $0.034
TPC RURAL 195 5,702,298 $1,330 $2,203 $3,532 $2,082 $1,041 $0.034
TPC REMOTE RURAL 1 29,243 ... $4,675 $6,005 $2,277 $1,138 $0.034
up to 100kVA TPC URBAN 0 0 $2,690 $1,651 $4,540 $4,540 $2,270 $0.034
TPC RURAL 0 0 $2,975 $4,087 $7,062 $7,062 $3,531 $0.034
up to 150kVA TPC URBAN 100 7,743,328 $4,484 $2,019 $6,503 $6,503 $3,252 $0.034
TPC RURAL 73 3,735,736 $4,463 $5,734 $10,197 $10,197 $5,098 $0.034
up to 200kVA TPC URBAN 13 1,426,063 $7,982 $3,020 $11,002 $11,002 $5,501 $0.034
TPC RURAL 5 1,864,215 $7,925 $10,347 $18,273 $18,273 $9,136 $0.034
up to 300kVA TPC URBAN 6 2,903,748 $11,972 $4,223 $16,195 $16,195 $8,098 $0.034
TPC RURAL 2 1,096,596 $11,888 $5,125 $27,013 $27,013 $13,506 $0.034
up to 500 kVA TPC URBAN 4 1,032,444 $19,954 $5,510 $26,464 $26,464 $13,232 $0.034
TPC RURAL 1 292,426 $19,813 $24,680 $44,493 $44,493 $22,247 $0.034
up to 750 kVA TPC URBAN 0 0 $29,931 $9,368 $39,299 $39,299 $19,650 $0.034
TPC RURAL 0 0 $29,720 $36,624 $66,344 $66,344 $33,172 $0.034
up to 1000 kVA TPC URBAN 0 0 $39,038 $12,277 $52,135 $52,135 $26,068 $0.034
TPC RURAL 0 0 $39,626 $48,568 $88,194 $88,194 $44,097 $0.034

Multiple Installations

For customers with multiple accounts and whose installations are connected to the same point of supply, there will be only one Line Charge plus a surcharge of $30 per annum (1250 connections) for a single phase or $36 per annum (2225 connections) for a three phase metered supply for each additional metered installation.

This only applies to installations up to 75kVA

Metering

The above charges include the cost of metering and for customers above 75kVA provision has been made for Day / Night, Peak Time of Use and Maximum Demand kVA metering

There is an extra charge of $30 per annum for a pre-payment key meter.

Individual Customer Line Charges

For customer installations above 75kVA individual line charges may be applied subject to agreement on the customer annual load profile. Adjustments may be required dependent on high voltage equipment ownership.



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 118


NZLII PDF NZ Gazette 1995, No 118





✨ LLM interpretation of page content

πŸ’° PowerNet Line Charges 1994/95 (continued from previous page)

πŸ’° Finance & Revenue
Electricity, Line Charges, PowerNet, Capacity, HV, LV, Fixed Charge, Variable Charge