✨ Electricity Transmission Costs




NEW ZEALAND GAZETTE

No. 118

TABLE 5

Shareholder Requirements

EIL NETWORK VALUE $16,541,520
EIL TOTAL ASSET VALUE $17,732,667
EIL USE CHARGE $4,200,000

| | |
| TPC NETWORK VALUE | $28,795,352 |
| TPC TOTAL ASSET VALUE | $32,163,637 |
| TPC USE CHARGE | $5,740,000 |

TABLE 6

SUBTRANSMISSION CHARGES

TPC

Substation Asset Value Total Use Charge Mtce. Cost Mtce. Cost /km Line
-Transformers $961,345
-Switchgear $1,603,097 $885,135
-Scada $309,299 $601,256
-Communications $481,942
-Buildings
-Land etc $210,991
-Capital $236,428
-Load Control (30%) $200,000 $956,685 $4,059,787
Lines Asset Value Total Use Charge Mtce. Cost Mtce. Cost /km Line
-O/H Lines $1,345,649 $652,729 $477,350
-Globo(100%) $1,174,079
-Capital $500,000 $637,790 $3,657,518 $667
-Load Control (20%)

EIL

Substation Asset Value Total Use Charge Mtce. Cost
-Transformers $603,012
-Auxiliary Plant/Scada $219,777 $461,866
-Buildings $393,435
-Land etc $5,712
-33kV Switchgear $80,956
-11kV Switchgear
-400V Switchgear $500,000
-Capital $10,000 $10,000 $1,950,030 $94,840
-Load Control (12.5%) $37,138
Lines Asset Value Total Use Charge Mtce. Cost
-O/H Lines $37,138 $4,232 $164,537
-U/G Cables $653,318
-Load Control (12.5%) $37,138 $694,688 $5,440

Supply Charge Allocation

| Capacity kVA | 0% |
| Winter MD kVA | 70% |
| Winter Peak kWh | 20% |
| Winter Day kWh | 10% |
| Summer Day kWh | 0% |

Back Up & Mtce. Charge Allocation

| Total kWh | 100% |

Rev/Exp. Balance

Exp Rev
EIL Charges $726,684 $726,684
TPC Charges $2,616,471 $2,628,080
Total $3,343,155 $3,354,764


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 118


NZLII PDF NZ Gazette 1995, No 118





✨ LLM interpretation of page content

πŸ’° Electricity Inverscargill Limited Distribution Costs (continued from previous page)

πŸ’° Finance & Revenue
Electricity, Distribution Costs, Transmission Parameters, Charges, Cost Apportionment, South Island