3468 NEW ZEALAND GAZETTE No. 108

5 and 6. The SAIDI for the total of interruptions was 276.9.

By class:

Class A - Planned by Trans Power ... 0.0
Class B - Planned by Wairarapa Electricity Limited ... 105.5
Class C - Unplanned by Wairarapa Electricity Limited ... 160.3
Class D - Unplanned by Trans Power ... 11.2
Class E - Unplanned by ECNZ ... 0.0
Class F - Unplanned by Generator (not ECNZ) ... 0.0
Class G - Planned/Unplanned other ... 0.0

7 and 8. The SAIFI for the total number of interruptions was 3.25.

By class:

Class A - Planned by Trans Power ... 0.00
Class B - Planned by Wairarapa Electricity Limited ... 0.76
Class C - Unplanned by Wairarapa Electricity Limited ... 1.92
Class D - Unplanned by Trans Power ... 0.57
Class E - Unplanned by ECNZ ... 0.00
Class F - Unplanned by Generator (not ECNZ) ... 0.00
Class G - Planned/Unplanned other ... 0.00

9 and 10. The CAIDI for the total number of interruptions was 85.2.

By class:

Class A - Planned by Trans Power ... 0.0
Class B - Planned by Wairarapa Electricity Limited ... 138.8
Class C - Unplanned by Wairarapa Electricity Limited ... 83.5
Class D - Unplanned by Trans Power ... 19.6
Class E - Unplanned by ECNZ ... 0.0
Class F - Unplanned by Generator (not ECNZ) ... 0.0
Class G - Planned/Unplanned other ... 0.0



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 108


NZLII PDF NZ Gazette 1995, No 108





✨ LLM interpretation of page content

🏭 Disclosure of Reliability Performance Measures Pursuant to Regulation 16 Electricity (Information Disclosure) Regulations 1994 (continued from previous page)

🏭 Trade, Customs & Industry
Reliability Performance, Interruptions, Faults, Electricity Transmission, Statistics, Electricity (Information Disclosure) Regulations 1994