β¨ Electricity Reliability Performance Measures
3468 NEW ZEALAND GAZETTE No. 108
5 and 6. The SAIDI for the total of interruptions was 276.9.
By class:
Class A - Planned by Trans Power ... 0.0
Class B - Planned by Wairarapa Electricity Limited ... 105.5
Class C - Unplanned by Wairarapa Electricity Limited ... 160.3
Class D - Unplanned by Trans Power ... 11.2
Class E - Unplanned by ECNZ ... 0.0
Class F - Unplanned by Generator (not ECNZ) ... 0.0
Class G - Planned/Unplanned other ... 0.0
7 and 8. The SAIFI for the total number of interruptions was 3.25.
By class:
Class A - Planned by Trans Power ... 0.00
Class B - Planned by Wairarapa Electricity Limited ... 0.76
Class C - Unplanned by Wairarapa Electricity Limited ... 1.92
Class D - Unplanned by Trans Power ... 0.57
Class E - Unplanned by ECNZ ... 0.00
Class F - Unplanned by Generator (not ECNZ) ... 0.00
Class G - Planned/Unplanned other ... 0.00
9 and 10. The CAIDI for the total number of interruptions was 85.2.
By class:
Class A - Planned by Trans Power ... 0.0
Class B - Planned by Wairarapa Electricity Limited ... 138.8
Class C - Unplanned by Wairarapa Electricity Limited ... 83.5
Class D - Unplanned by Trans Power ... 19.6
Class E - Unplanned by ECNZ ... 0.0
Class F - Unplanned by Generator (not ECNZ) ... 0.0
Class G - Planned/Unplanned other ... 0.0
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 108
NZLII —
NZ Gazette 1995, No 108
β¨ LLM interpretation of page content
π
Disclosure of Reliability Performance Measures Pursuant to Regulation 16 Electricity (Information Disclosure) Regulations 1994
(continued from previous page)
π Trade, Customs & IndustryReliability Performance, Interruptions, Faults, Electricity Transmission, Statistics, Electricity (Information Disclosure) Regulations 1994