3466 NEW ZEALAND GAZETTE No. 108

Disclosure of Energy Efficiency Performance Measuring and Statistics
Pursuant to Regulation 15 Electricity (Information Disclosure)
Regulations 1994

1. Energy delivery efficiency performance measures

(a) Load factor 63.5%

Percentage of electrical energy entering the transmission system over
maximum demand times hours per year.

(b) Loss ratio 5.2%

Transmission losses over electricity entering the system during the financial
year.

(c) Capacity utilisation 25.7%

Maximum demand over total transformer capacity

2. Statistics

(a),(b) and (c) System length, broken down by nominal line voltages and sub-analysed into overhead and underground categories:

Overhead (km) Underground (km) Total (km)
110kV 0.0 0.0 0.0
66kV 0.0 0.0 0.0
33kV 171.1 1.6 172.7
22kV 0.0 0.0 0.0
11kV 1521.2 34.2 1555.4
6.6kV 0.0 0.0 0.0
3.3kV 3.4 0.0 3.4
Total 1695.7 35.8 1731.5

(d) Transformer capacity (kilovolt amperes) 158,198 kVA

(e) Maximum demand (kilowatts) 40,616 kW

(f) Total electricity supplied from the system (kilowatt hours) 214.2 x 10⁢ kWh



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 108


NZLII PDF NZ Gazette 1995, No 108





✨ LLM interpretation of page content

🏭 Disclosure of Energy Efficiency Performance Measuring and Statistics

🏭 Trade, Customs & Industry
Energy Efficiency, Performance Measures, Electricity Transmission, Statistics, Electricity (Information Disclosure) Regulations 1994