3196 NEW ZEALAND GAZETTE No. 101
(b) Indirect line costs per electricity customer, which are calculated in accordance with the following formula:
$$
\frac{a}{b}
$$
where -
a is indirect expenditure (in dollars); and
b is total customers.
$142
Disclosure of Reliability Performance Measures Pursuant to Regulation 16 Electricity (Information Disclosure) Regulations 1994
- Total number of interruptions, together with a breakdown of that total according to interruption class.
| Classes A, D-G | 0 |
| Class B | 260 |
| Class C | 459 |
| TOTAL | 719 |
- The total number of faults per 100 circuit kilometres of prescribed voltage electric line.
50.64
- The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
| 33kV | 0 |
| 11kV | 6.93 |
| Overall| 4.69 |
- The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
| 33kV | 3.36 |
| 11kV | 59.40 |
| Overall| 51.44 |
- The SAIDI for the total of interruptions, is calculated in accordance with the following formula:
$$
\frac{a}{b}
$$
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 101
NZLII —
NZ Gazette 1995, No 101
β¨ LLM interpretation of page content
π°
Disclosure of Financial Performance Measures and Efficiency Performance Measures
(continued from previous page)
π° Finance & RevenueFinancial Performance, Efficiency Performance, Electricity Regulations, Accounting Return, Direct Line Costs, Indirect Line Costs
π Disclosure of Reliability Performance Measures
π Trade, Customs & IndustryElectricity, Reliability Performance, Interruptions, Faults, SAIDI