| Total Number of interruptions (above 3.3kV) | Duration Factor | Customers affected |
|---|---|---|
| Planned interruption by Trans Power | Class A | 0 |
| Planned interruption by Capital Power | Class B | 55 |
| Unplanned interruption within Capital Power Network | Class C | 58 |
| Unplanned interruption by Trans Power | Class D | 4 |
| Unplanned interruption in generation by ECNZ | Class E | 0 |
| Unplanned interruption by other generator | Class F | 0 |
| Other interruptions | Class G | 0 |
| Total | 117 |
Total number of faults per 100 circuit kilometres of prescribed voltage electric line.
| Total | per 100km | |
|---|---|---|
| 33kV | 0 | 0.0 |
| 11kV | 58 | 14.37 |
| Sum | 58 | 12.18 |
Total number of faults per 100 circuit kilometres underground, by prescribed voltage
| Total | per 100km | |
|---|---|---|
| 33kV | 0 | 0.0 |
| 11kV | 28 | 7.4 |
| Sum | 28 | 6.2 |
Total number of faults per 100 circuit kilometres overhead, by prescribed voltage
| Total | per 100km | |
|---|---|---|
| 33kV | 0 | 0.0 |
| 11kV | 30 | 111.1 |
| Sum | 30 | 111.1 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 100
NZLII —
NZ Gazette 1995, No 100
β¨ LLM interpretation of page content
πΎ
Capital Power Limited Reliability Performance Measures and Statistics
(continued from previous page)
πΎ Primary Industries & ResourcesReliability Performance, Interruptions, Duration Factor, Customers Affected, Faults per Circuit Kilometre, Electricity Supply