Education and Electricity Notices




1052
NEW ZEALAND GAZETTE
No. 23

Education

Education (Early Childhood Centres) Regulations 1990

Cancellation of a Licence for an Early Childhood Centre

Pursuant to regulation 14 of the Education (Early Childhood Centres) Regulations 1990, and acting under authority delegated by the Secretary of Education, I hereby cancel the licence dated the 3rd day of March 1993, which was granted under those regulations to Elizabeth Eyers in respect of Wairakei Playcentre, Kauri Drive, Wairakei Village.

This notice shall take effect the day after the date of its notification in the New Zealand Gazette.

K. PHILLIPS, Senior Manager, National Operations.

go1696

Cancellation of a Licence for an Early Childhood Centre

Pursuant to regulation 14 of the Education (Early Childhood Centres) Regulations 1990, and acting under authority delegated by the Secretary of Education, I hereby cancel the licence, dated the 31st day of May 1991, which was granted under those regulations to Mary Lee in respect of Papakura First Presbyterian Pre-school, 4 Cole Street, Papakura, Auckland.

This notice shall take effect the day after the date of its notification in the New Zealand Gazette.

K. PHILLIPS, Senior Manager, National Operations.

go1766

Electricity Corporation of New Zealand

Standard Terms and Conditions for Non-Contractual Electricity Supply

INDEX

  1. Interpretation
  2. Supply of Electricity
  3. Pricing and Payment
  4. Determination of Quantity
  5. Rights of Access
  6. Cessation of Supply
  7. Modifications
  8. Notices

Schedule - Pricing

THESE TERMS AND CONDITIONS APPLY FROM 1 APRIL 1994 WHERE A PERSON CONNECTED TO THE NATIONAL GRID TAKES ELECTRICITY GENERATED OR MADE AVAILABLE BY ECNZ WHICH IS NOT SUPPLIED IN ACCORDANCE WITH A CONTRACT WITH ECNZ OR AN ALTERNATIVE SUPPLIER.

1. INTERPRETATION

In these Conditions, unless the context otherwise requires:

1.1 Definition

“Alternative Supplier” means a person other than ECNZ who makes available Electricity for supply;

“Bank Bill Bid Rate” means the New Zealand dollar bank bill 3 month bid rate (rounded upwards to the nearest first decimal place) as appearing at 11.00 am or as soon as practicable thereafter on the relevant day in Wellington on page BKBM of the Reuters screen;

“Business Day” means any day of the week other than a Saturday, Sunday or statutory holiday as observed in Wellington;

“Conditions” means this document including the Schedule;

“De-energise” means the movement of any isolator, breaker or switch or the removal of any fuse or link whereby no Electricity can flow to or from the relevant Network or, where appropriate, part thereof;

“Default Rate” means the Bank Bill Bid Rate plus five per cent per annum;

“ECNZ” means Electricity Corporation of New Zealand Limited a duly incorporated company having its registered office in Wellington together with its successors and assigns;

“ECNZ’s System” means the generators, transformers and other electrical facilities on ECNZ’s side of the points at which it injects Electricity into the National Grid;

“Electricity” means electrical energy as measured in kilowatt-hours (kWh);

“G.S.T.” means goods and services tax payable pursuant to the Goods and Services Tax Act 1985 or any similar tax levied in substitution therefor;

“Half Hour” means any period of 30 consecutive minutes commencing on the hour or at thirty minutes past the hour;

“Metering Equipment” means metering equipment for the purpose of measuring Electricity sales including, but not limited to:

(a) active and reactive energy meters with pulsing output;

(b) current transformers;

(c) voltage transformers;

(d) Half Hour integrating pulse recorders using external or internal clocks; and

(e) associated equipment (including wiring).

“Month” means a calendar month and “Monthly” shall be construed accordingly;

“National Grid” means the plant, transmission lines and other facilities (including but not limited to all associated civil works and fixtures) operated by the National Grid Manager which interconnect the points where Electricity is injected by ECNZ and the Points of Output Connection of all those persons having plant of any kind whatsoever connected to such facilities for the purpose of injecting or receiving Electricity;

“National Grid Manager” means the person for the time being operating the National Grid;

“Points of Output Connection” means the outgoing terminals of the feeder circuit breaker at the facilities where the Purchaser uplifts, or arranges for the uplift of Electricity from the National Grid;

“Purchaser” means any person taking a supply of Electricity (which is generated or made available by ECNZ) from the National Grid other than in accordance with a formal supply contract with ECNZ or with an Alternative Supplier;

“Reconciliation Agreement” means the Metering and



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1994, No 23


NZLII PDF NZ Gazette 1994, No 23





✨ LLM interpretation of page content

🎓 Cancellation of Early Childhood Centre Licence

🎓 Education, Culture & Science
Licence cancellation, Early Childhood Centre, Wairakei Playcentre
  • Elizabeth Eyers, Licence cancelled

  • K. Phillips, Senior Manager, National Operations

🎓 Cancellation of Early Childhood Centre Licence

🎓 Education, Culture & Science
Licence cancellation, Early Childhood Centre, Papakura First Presbyterian Pre-school
  • Mary Lee, Licence cancelled

  • K. Phillips, Senior Manager, National Operations

🏗️ Standard Terms and Conditions for Non-Contractual Electricity Supply

🏗️ Infrastructure & Public Works
Electricity supply, Terms and conditions, ECNZ