โจ Irrigation Scheme Settlements
4336 NEW ZEALAND GAZETTE No. 193
introduced new methods of water charging. The water supply commenced in 1965.
The Upper Waitaki Pumped Extension Irrigation Scheme was approved in 1970 for an area of 490 hectares at the lower end of the gravity section. Two pumps lift 0.3 cumec of water 21 metres in height to a gravity race which supplies 12 properties.
The main water race in the lower scheme is 30 km long and the main race in the upper scheme is 9 km long. Extensive syphons are utilised in crossing the numerous creeks and steep gullies within the distribution systems.
- Previous Gazette References
Gravity Supply
24 August 1961, NZ Gazette No 53 Page 1302
4 May 1978, NZ Gazette No 37, page 1306
Pumped Supply
27 February 1969, NZ Gazette No 12 page 363
1 May 1980, NZ Gazette No 49, page 1268
- Purchaser
Upper Waitaki Irrigation Co Ltd
- Effective Date 15.9.89
- Date of Purchase 11.7.91
- Date of Financial Settlement 23.9.92
Amount of Settlement ($)
- Purchase price paid for the assets 1
- Water rates revenue refunded 0
- Other payments by the Crown 28,054
- Net Settlement by Crown 14,999
- Debtors transferred to Purchaser ($) 21,121
Assets & Liabilities of the Crown before Settlement
($)
- Historic Capital Cost 658,950
- Accumulated Liabilities 171,052
- Liabilities Retained by the Crown None
WAIAUA
- Description
The Scheme draws water from the Waiau River near Opotiki to supply an area of 110 hectares involving 16 properties. Water is pumped into storage and then piped to the properties through 6 km of main line. The Scheme was only partly developed for horticulture due to the fall in financial returns from the horticultural industry.
A $22,000 cash grant was given to the irrigators to provide an establishment fund.
Supply commenced in September 1984. The Scheme was designed for a flow rate of 62.5 litres/second for an on orchard supply of 0.5 litres/second/hectare.
- Previous Gazette References
2 February 1984, No 10, page 262.
8 August 1985, No 145, page 3334.
16 January 1986, No 4, page 97.
- Purchaser
Waiau Irrigation Co Ltd
- Effective Date 1.5.89
- Date of Purchase 3.7.90
- Date of Financial Settlement 23.6.92
Amount of Settlement ($)
- Purchase price paid for the assets 1
- Water rates revenue refunded 97,037
- Other payments by the Crown 0
- Net Settlement by Crown 61,340
- Debtors transferred to Purchaser ($) 20,353
Assets & Liabilities of the Crown before Settlement
($)
- Historic Capital Cost 644,815
- Accumulated Liabilities 922,934
- Liabilities Retained by the Crown None
WOLDS
- Description
The Wolds Irrigation Scheme consists of two 350 mm pipe syphons from the south side of the Tekapo-Pukaki power canal 10 km from the Tekapo A Power Station. Each syphon has a controlled outlet and can deliver 0.35 cumec. The assets sold include easements for the syphons and water rights.
The Scheme was designed to irrigate 400 hectares on two properties. The on-farm development received a 50% suspensory loan for a period of 10 years which ended in 1991.
- Previous Gazette References
No Gazette references
- Purchaser
Ministry of Defence
- Effective Date 19.12.90
- Date of Purchase 19.12.90
- Date of Financial Settlement 8.11.91
Amount of Settlement ($)
- Purchase price paid for the assets 10,000
- Water rates revenue refunded 0
- Other payments by the Crown 0
- Net Settlement by Crown 0
- Debtors transferred to Purchaser ($) 3,000
Assets & Liabilities of the Crown before Settlement
($)
- Historic Capital Cost (estimated) 38,000
- Accumulated Liabilities 0
- Liabilities Retained by the Crown None
SOURCE OF FINANCIAL INFORMATION
The financial information in this report has been prepared by the Ministry of Agriculture and Fisheries from the best historical information available to the Ministry when it took over responsibility for Community Irrigation Schemes owned by the Crown on 1 April 1988. The approach taken by MAF was determined and assessed by Touche Ross, Accountants, and found to be valid. The Audit Office reviewed the accounts prepared by MAF for presentation and reasonableness of the accounting treatment.
Accounting by the Crown
The Crownโs irrigation assets and liabilities were not recorded in the Crown loan Accounts during the management of the assets by the Ministry of Works and Development prior to 1 April 1988. After the assets were transferred to MAF on 1 April 1988, expenditure from that date was recorded in the accounts of MAF Technology until 30 June 1990. From 1 July 1990, all
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1992, No 193
NZLII —
NZ Gazette 1992, No 193
โจ LLM interpretation of page content
๐พ
Upper Waitaki Irrigation Scheme Settlement
(continued from previous page)
๐พ Primary Industries & ResourcesIrrigation, Upper Waitaki, Pumped Extension, Water Charging, Settlements
๐พ Waiau Irrigation Scheme Settlement
๐พ Primary Industries & ResourcesIrrigation, Waiau River, Opotiki, Horticulture, Settlements
๐พ Wolds Irrigation Scheme Settlement
๐พ Primary Industries & ResourcesIrrigation, Tekapo-Pukaki Canal, Ministry of Defence, Settlements
๐ฐ Source of Financial Information for Irrigation Schemes
๐ฐ Finance & RevenueFinancial Information, Ministry of Agriculture and Fisheries, Audit, Accounting