✨ Telecommunications Charges
30 OCTOBER
NEW ZEALAND GAZETTE
3605
Hamilton—Rotorua
Hamilton—Tauranga
Hamilton—Palmerston North
Hamilton—Wellington
Napier—Hastings
Palmerston North—Napier
Palmerston North—New Plymouth
Wellington—Nelson
Wellington—Christchurch
Christchurch—Dunedin
Dunedin—Invercargill
All programme circuits required over other routes will be costed on an individual basis.
Note:
P1 circuits (7.5 kHz) are no longer available to new customers.
5.6.1 Installation Charges
- Charge per end for new connection or installation for P2 circuits $1500.00 $2250.00
- Charge per end for new connection or installation for P3 circuits $1500.00 $2250.00
- Charge per end for new connection or installation for P3S circuits $2250.00 $4000.00
5.6.2 Monthly Access Charges
Access Charges for Circuits up to 5km in length
- Charge per end of circuit for P2 circuits $60.00 $110.00
- Charge per end of circuit for P3 circuits $70.00 $120.00
- Charge per end of circuit for P3S circuits $120.00 $240.00
- Charge per end of circuit for P1 circuits $33.00
Access Charges for Circuits more than 5km in length
- Charge per end of circuit for P2 circuits $80.00 $150.00
- Charge per end of circuit for P3 circuits $90.00 $170.00
- Charge per end of circuit for P3S circuits $170.00 $340.00
- Charge per end of circuit for P1 circuits $33.00
P1 circuits have an additional kilometre charge applied to the access charge if the access end of a circuit is over 5 kilometres in length:
- Charge per kilometre after first five kilometres $33.00
5.6.3 Monthly Transmission Charges
Programme Circuits (P2, P3, P3S): Monthly Transmission Charges
| Junction (City) Step | Step A | Step B | Step C | Step D | Step E |
|---|---|---|---|---|---|
| P2 (Uni) | $44.00 | $1910.00 | $2230.00 | $3010.00 | $4260.00 |
| P3 (Uni) | $50.00 | $1910.00 | $2230.00 | $3010.00 | $4260.00 |
| P3S (Uni) | $70.00 | $3820.00 | $4460.00 | $6020.00 | $8520.00 |
| P2 (Bi) | $64.00 | $2450.00 | $2770.00 | $3550.00 | $4800.00 |
| P3 (Bi) | $70.00 | $2450.00 | $2770.00 | $3550.00 | $4800.00 |
| P3S (Bi) | $140.00 | $4900.00 | $5540.00 | $7100.00 | $9600.00 |
Note:
- The Junction (City) Step transmission charge applies to circuits with a total length of up to 20 km which are completely within an urban area. Junction (City) Step areas are defined as the urban area rather than the local-calling area, as some local calling areas are extremely large and include areas that cannot be defined as urban. The limit for the Junction (City) Step is set at 20 km because beyond this distance extra equipment is required to transmit the signal at an acceptable quality level, and is subject to the availability of suitable cable.
- The local ROC will decide, subject to approval by the Telecom Tariff Manager, when a Junction (City) Step applies. In all cases, the necessary conditioned analogue cable pairs must be available, and technical feasibility constraints met, if the Junction (City) Step charge is to apply.
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1992, No 175
NZLII —
NZ Gazette 1992, No 175
✨ LLM interpretation of page content
🚂
Programme Circuits Charges
(continued from previous page)
🚂 Transport & CommunicationsProgramme circuits, Broadcasting, P1, P2, P3, P3S, Installation charges, Monthly access charges, Monthly transmission charges, Urban area circuits