✨ Telecom Charges




30 OCTOBER NEW ZEALAND GAZETTE 4089

regarded as a continuous urban area. Circuits completely within the urban areas of other centres will usually be charged the Step A rate; but they may be determined as metropolitan by the local Director of Marketing, subject to the agreement of the Telecom Tariff Manager.

Where both ends of a Megalink circuit terminate off the same local exchange, there are no transmission charges.

Megalink: Monthly Transmission Charges

City Step Step A Step B Step C Step D Step E
$3600.00 $6510.00 $14,640.00 $27,360.00 $43,680.00

4.11.4 Alteration and Reconfiguration Charges

All alteration and reconfiguration charges (such as speed changes) which require a site visit will be charged based on actual costs. They will include, for example, labour, materials and travelling time.

4.11.5 Other Charges

Minimum Lease

The minimum lease period for Megalink is 6 months.



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1990, No 188


NZLII PDF NZ Gazette 1990, No 188





✨ LLM interpretation of page content

πŸš‚ Megalink Service Charges (continued from previous page)

πŸš‚ Transport & Communications
Megalink, Transmission charges, Urban areas, Metropolitan rates, Exchange termination, Monthly charges, Alteration charges, Reconfiguration charges, Minimum lease