Programme Circuits Charges




NEW ZEALAND GAZETTE

No. 188

Palmerston North—Wellington

Wellington—Nelson

Wellington—Christchurch

Christchurch—Dunedin

Dunedin—Invercargill

All programme circuits required over other routes will be costed on an individual basis.

4.6.1 Installation Charges

Unidirectional Bidirectional
Charge per end for new connection for P2 circuits $1500.00 $2250.00
Charge per end for new connection for P3 circuits $1500.00 $2250.00
Charge per end for new connection for P3S circuits $2250.00 $4000.00

4.6.2 Monthly Access Charges

Access Charges for Circuits up to 5km in length

Unidirectional Bidirectional
Charge per end of circuit for P2 circuits $60.00 $110.00
Charge per end of circuit for P3 circuits $70.00 $120.00
Charge per end of circuit for P3S circuits $120.00 $240.00

Access Charges for Circuits more than 5km in length

Unidirectional Bidirectional
Charge per end of circuit for P2 circuits $80.00 $150.00
Charge per end of circuit for P3 circuits $90.00 $170.00
Charge per end of circuit for P3S circuits $170.00 $340.00

4.6.3 Monthly Transmission Charges

Programme Circuits (P2, P3, P3S): Monthly Transmission Charges

Junction (City) Step Step A Step B Step C Step D Step E
P2 (Uni) $44.00 $1910.00 $2230.00 $2540.00 $3010.00
P3 (Uni) $50.00 $1910.00 $2230.00 $2540.00 $3010.00
P3S (Uni) $70.00 $3820.00 $4460.00 $5080.00 $6020.00
P2/P3 (Bi) $64.00 $2450.00 $2770.00 $3080.00 $3550.00
P2/P3(Bi) $70.00 $2450.00 $2770.00 $3080.00 $3550.00
P3S(Bi) $140.00 $4900.00 $5540.00 $6160.00 $7100.00

Note:

  • The Junction (City) Step transmission charge applies to circuits with a total length of up to 20 km which are completely within an urban area. Junction (City) Step areas are defined as the urban area rather than the local-calling area, as some local calling areas are extremely large and include areas that cannot be defined as urban. The limit for the Junction (City) Step is set at 20 km because beyond this distance extra equipment is required to transmit the signal at an acceptable quality level, and is subject to the availability of suitable cable.
  • The local ROC will decide, subject to approval by the Telecom Tariff Manager, when a Junction (City) Step applies. In all cases, the necessary conditioned analogue cable pairs must be available, and technical feasibility constraints met, if the Junction (City) Step charge is to apply.
  • In non-urban areas, and for circuits with a total length of more than 20 km, Step A rates will apply.

4.6.4 Alteration and Reconfiguration Charges

Unidirectional Bidirectional
External removal charge per end of circuit for P2 circuits $1500.00 $2250.00
External removal charge per end of circuit for P3 circuits $1500.00 $2250.00
External removal charge per end of circuit for P3S circuits $2250.00 $4000.00

4.6.5 Other Charges

Studio to Transmitter Links

Studio to transmitter links (STL) charges are to be calculated on a case-by-case basis.

Temporary Lease

The minimum lease period for circuits and associated equipment is 6 months, if customers wish to receive Telecom's normal monthly charges. For temporary leasing periods of less than 6 months, customers are charged a weekly rate which is 34% of the appropriate monthly charge. There is a minimum charge that applies to temporary leases of any duration. This minimum charge is twice the weekly temporary-lease charge (i.e., 68% of the monthly charge).



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1990, No 188


NZLII PDF NZ Gazette 1990, No 188





✨ LLM interpretation of page content

🚂 Programme Circuits (P2, P3, P3S) Charges (continued from previous page)

🚂 Transport & Communications
Programme circuits, Broadcasting, Music content, Unidirectional, Bidirectional, Charges, Routes, Auckland, Whangarei, Hamilton, Rotorua, Tauranga, Palmerston North, Napier, New Plymouth