Telecom Charges




NEW ZEALAND GAZETTE

No. 188

An A1 circuit is a 2-wire analogue circuit, unconditioned for data
An A2 circuit is a 4-wire analogue circuit, unconditioned for data
An A3 circuit is a 4-wire special quality analogue circuit, conditioned for data.

4.4.1 Installation Charges

  • Charge per end for new connection or installation for A1 circuit ... $420.00
  • Charge per end for new connection or installation for A2 circuit ... $420.00
  • Charge per end for new connection or installation for A3 circuit ... $500.00

4.4.2 Extended Area Installation Charges

In cases where electronic enhancement of the copper cable is required to provide a satisfactory service to the customer (typically for distances of over 10 km), a capital contribution will be charged. The capital contribution will be negotiated between Telecom’s Regional Operating Companies and the customer.

4.4.3 Monthly Access Charges

  • Charge per end of circuit for A1 circuits ... $31.82
  • Charge per end of circuit for A2 circuits ... $63.64
  • Charge per end of circuit for A3 circuits ... $63.64
  • Distance surcharge per kilometre for A1 circuits ... $8.50
  • Distance surcharge per kilometre for A2 circuits ... $12.50
  • Distance surcharge per kilometre for A3 circuits ... $12.50

Note:
The distance surcharge applies wherever the circuit terminates more than 5 km from the exchange.

  • Junction surcharge per kilometre for A1 circuits ... $8.50
  • Junction surcharge per kilometre for A2 circuits ... $12.50
  • Junction surcharge per kilometre for A3 circuits ... $12.50

Note:
The junction surcharge applies where access is required between exchanges within a local-calling area.

4.4.4 Monthly Transmission Charges

Analogue Data Service: Monthly Transmission Charges

Step A Step B Step C Step D Step E
A1 circuits $550.00 $800.00 $1120.00 $1660.00 $2150.00
A2 circuits $550.00 $800.00 $1120.00 $1660.00 $2150.00
A3 circuits $600.00 $880.00 $1230.00 $1830.00 $2370.00

4.4.5 Alteration and Reconfiguration Charges

  • External removal charge per end for A1 circuits ... $420.00
  • External removal charge per end for A2 circuits ... $420.00
  • External removal charge per end for A3 circuits ... $500.00
  • Internal removal charge per end for A1, A2, A3 circuits ... $60.00
  • Jumpering charge, per site, for redirecting existing A1 circuits within the exchange, at the customer request ... $140.00
  • Jumpering charge, per site, for redirecting existing A2 circuits within the exchange, at the customers request ... $140.00
  • Jumpering charge, per site, for redirecting existing A3 circuits within the exchange, at the customers request ... $190.00

4.4.6 Other Charges

Temporary Lease

The minimum lease period for circuits and associated equipment is 6 months, if customers wish to receive Telecom’s normal monthly charges. For temporary leasing periods of less than 6 months, customers are charged a weekly rate which is 34% of the appropriate monthly charge. There is a minimum charge that applies to temporary leases of any duration. This minimum charge is twice the weekly temporary-lease charge (i.e., 68% of the monthly charge).



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1990, No 188


NZLII PDF NZ Gazette 1990, No 188





✨ LLM interpretation of page content

🚂 National Leased-Circuit Services Charges (continued from previous page)

🚂 Transport & Communications
Leased circuits, Telecom, Charges, Installation, Access, Transmission, Kilometre charges, Extended area, Monthly access, Monthly transmission, Alteration, Reconfiguration, Temporary lease, Reconnection, Signalling converter, Analogue data service