✨ LPG Approvals and Forestry Contracts
5744
THE NEW ZEALAND GAZETTE
No. 234
LPG Fuel System Approvals
Pursuant to regulation 90B of the Traffic Regulations 1976* (as inserted by the Traffic Regulations 1976, Amendment No. 7) and pursuant to the powers delegated to me by the Secretary for Transport, I, Robert Norman Abram, Chief Automotive Engineer, hereby approve the components listed in the Schedule hereto for inclusion in any LPG automotive fuel system installed and operated in accordance with the requirements of New Zealand Standard NZS 5422, Part 1, 1980 (and any standard made in amendment thereto or in substitution therefor) subject to the conditions (if any) set out in respect of any component in the said Schedule.
SCHEDULE
LPG FUEL CYLINDERS
| MOT Reference | Manufacturer | Country of Origin | Specification | Material | Inspection Authority | Working Pressure Rating (MPa) | Test Pressure (MPa) |
|---|---|---|---|---|---|---|---|
| AF LO3B 028 | Crown Sheetmetal | New Zealand | AS 1210 Int 1 | Stainless Steel | Lloyds | 2.55 | 3.3 |
CONDITIONS OF APPROVAL
-
That they be permanently and clearly marked, on a suitably attached metal plate, with characters not less than 6 mm high if space permits but in any case not less than 3 mm high, displaying the following information:
(a) The specification to which the cylinder was manufactured.
(b) The manufacturer’s name or mark and the serial number of the cylinder.
(c) The date of the original cylinder inspection and the identification mark of the inspection authority who made the inspection.
(d) The date of any periodic cylinder test and the identification mark of the cylinder testing station who made each test.
(e) The cylinder test pressure.
(f) The nominal water capacity of the cylinder.
(g) The tare weight of the cylinder. -
That they be clearly marked or labelled to indicate that the cylinder is suitable for use with LPG.
-
That they be provided with valve threads and fittings which provide the following functions—
(a) Filling connection incorporating a non return valve.
(b) Service valve incorporating an excess flow valve.
(c) Contents gauge.
(d) Pressure—relief valve.
(e) A fixed liquid level indicator or an automatic fill shut off device which prevents the cylinder being filled beyond 85 percent of the total cylinder capacity.
Valves and fittings shall have a service pressure rating of at least that of the cylinder to which they are fitted and shall be dimensioned, threaded and marked in accordance with the requirements of section 2.3 of New Zealand Standard NZS 5422 “The use of LPG and CNG Fuels in Internal Combustion Engines—Part 1 LPG Fuel”. -
That they be tested prior to installation and at periods not exceeding 5 years in accordance with the requirements of Australian Standard AS 2337-1980 or in accordance with the periodic test requirements laid down in the specification to which the cylinder was manufactured.
Dated at Wellington this 6th day of December 1985.
R. N. ABRAM, Chief Automotive Engineer.
*S.R. 1976/227
(M.O.T. 14/1/17/16)
New Zealand Forest Service—Schedule of Contracts for Sale of Wood of $6,000 or More in Value
LOG SALE ON TRUCK (CLEARFELLING)
| Conservancy | Forest | Purchaser | Species | Type | Price per m³ $ | Volume m³ | Value $ |
|---|---|---|---|---|---|---|---|
| Auckland | Coromandel Forest Park | Tasman Forestry Ltd. | P. radiata | sawlogs | 51.54 | 31 756 | 1,636,704 |
| P. elliottii/ taeda/ patula | sawlogs | 47.54 | 14 944 | 710,438 | |||
| Tairua | Tasman Forestry Ltd. | P. radiata P. elliottii/ taeda | sawlogs | 49.04 45.04 | 139 908 17 292 | 6,861,088 778,832 | |
| Coromandel/ Tairua/ Marantaua | Tasman Forestry Ltd. | P. palustris P. radiata/ elliottii/ taeda/ nana | sawlogs pulp | 43.04 12.00 | 33 050 10 000 | 1,422,472 120,000 | |
| Tairua | Pine Processors Ltd. | P. radiata/ taeda/ elliottii/ palustris | 2nd grade sawlogs | 18.00) 21.50) | 18–27 000 | 430,000 |
STANDING TREE (THINNINGS)
| Auckland | Purcora Forest Park | Braithwaite Timbers Ltd. | Thuja Plicata Cupressus Lawsoniana | sawlogs | 9.20 | 4100 | 37,720 |
STANDING TREE (CLEARFELLING)
| Wellington | Santoñ | T & J McIlwaine | P. radiata | pruned sawlogs unpruned sawlogs smallwood pulp | 62.00 42.00 14.00 6.00 | 322) 478) 34) 115) | 41,206 |
LOG SALE AT FOREST RIDE (THINNINGS)
| Southland | Herbert | Palmerston Timber Ltd. | P. radiata | prepared sawlogs | 42.55 | 5000 | 212,750 |
170
25
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1985, No 234
NZLII —
NZ Gazette 1985, No 234
✨ LLM interpretation of page content
🚂
LPG Fuel System Approvals
(continued from previous page)
🚂 Transport & Communications6 December 1985
LPG fuel cylinders, automotive fuel systems, approvals, regulations
- Robert Norman Abram, Chief Automotive Engineer
🌾 Schedule of Contracts for Sale of Wood
🌾 Primary Industries & ResourcesForestry, log sales, contracts, wood sales, New Zealand Forest Service
- Robert Norman Abram, Approved LPG components
- T & J McIlwaine, Purchased standing trees