Tariff and CNG Fuel System Notices




11 MARCH THE NEW ZEALAND GAZETTE 733

TARIFF DECISION LIST No. 533

Decision of the Minister of Customs Under the Customs Tariff (Subject to Amendment or Cancellation by Notification in the Gazette)

DETERMINATION

Tariff Item No. Goods Rates of Duty Part II Ref. Concession Code Effective
Normal Pref. From
84.45.001 Deter'n Metal hacksaws not exceeding 250 mm cutting capacity, in square sections 40 Aul 20 Can 25 DC 25 .. 206031A

Decision Cancelled:

| 84.45.001 Deter'n | Metal ... capacity | .. | .. | .. | 112063J | .. | .. |

Dated at Wellington this 11th day of March 1982.

P. J. McKONE, Comptroller of Customs.

CNG Fuel System Approvals

PURSUANT to regulation 90b of the Traffic Regulations 1976 (as inserted by the Traffic Regulations 1976 Amendment No. 7) and pursuant to the powers granted to me by the Secretary for Transport, I, Trevor Alan Lister, Senior Automotive Engineer, hereby approve the components listed in the Schedule hereto for inclusion in any CNG fuel system installed and operated in accordance with the requirements of New Zealand Standard NZS 5422, Part 2, 1980 (and any standard made in amendment thereto or in substitution therefor), subject to the conditions (if any), set out in respect of any component in the said Schedule.

SCHEDULE

CNG FUEL CYLINDERS

MOT Reference Manufacturer Drawing Number Material Specification Independent Inspection Authority Nominal Water Capacity (litres) Working Pressure Rating (MPA) Test Pressure (MPA)
AF C03 101 Nippon High Pressure C559 Steel JIS B8241 Bureau Veritas 60 16.5 27.5
AF C03 102 Co. Japan C561 Steel JIS B8241 Bureau Veritas 65 16.5 27.5
AF C03 103 C563 Steel JIS B8241 Bureau Veritas 90 16.5 27.5
AF C03 104 C546 Steel JIS B8241 Bureau Veritas 49.4 16.5 41.4

CNG cylinders are approved subject to the following conditions—

  1. That they be permanently and clearly marked, either on a thickened portion of the cylinder or on a suitably attached metal plate, with characters not less than 6 mm high if space permits but in any case not less than 3 mm high, displaying the following information:

(a) The specification to which the cylinder was manufactured.

(b) The manufacturers name or mark, and the serial number of the cylinder.

(c) The date of the original cylinder inspection and the identification mark of the inspection authority who made the inspection.

(d) The date of any periodic cylinder test and the identification mark of the cylinder testing station who made each test.

(e) The cylinder test pressure.

(f) The charging pressure of the cylinder at 15°C.

(g) The nominal water capacity of the cylinder.

(h) The tare weight of the cylinder.

(i) An identification that the cylinder is suitable for use with CNG.

  1. That the cylinder be provided with valve threads of the form specified in British Standard BS 341 “Valve Fittings for Compressed Gas Cylinders”.

  2. That the cylinders be tested at periods not exceeding 5 years in accordance with the periodic test requirements laid down in the specification to which the cylinder was manufactured.

  3. That the cylinder be provided with a cylinder shut off valve designed for a working pressure of 16.5 MPa and capable of withstanding the test pressure of the cylinder. Cylinder shut-off valves shall be fitted with a hand wheel to facilitate ease of opening and closing of the valve and shall be fitted with a pressure relief device comprising of a burst disc backed by fusible alloy. The fusible alloy is to have a nominal yield temperature of 100°C, and the burst disc shall yield at a pressure of not less than 24.75 MPa and not more than the test pressure of the cylinder. Cylinder valves shall be provided with an outlet thread of ¾ inch NPT (female) and a stem thread compatible with the cylinder neck thread.

Dated at Wellington this 4th day of March 1982.

T. A. LISTER, for Secretary for Transport.

S.R. 1976/227

Amendment No. 1: S.R. 1978/72

Amendment No. 2: S.R. 1978/301

Amendment No. 3: S.R. 1979/128

Amendment No. 4: S.R. 1980/31

Amendment No. 5: S.R. 1980/115

Amendment No. 6: S.R. 1981/158

Amendment No. 7: S.R. 1981/311

(M.O.T. 14/1/17)



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1982, No 26


NZLII PDF NZ Gazette 1982, No 26





✨ LLM interpretation of page content

🏭 Tariff Decision List No. 533

🏭 Trade, Customs & Industry
11 March 1982
Tariff, Customs, Metal hacksaws, Duty rates
  • P. J. McKONE, Comptroller of Customs

🚂 CNG Fuel System Approvals

🚂 Transport & Communications
4 March 1982
CNG fuel system, Approvals, Traffic Regulations, NZS 5422
  • Trevor Alan Lister, Senior Automotive Engineer