✨ Freight Rates for Cement
502 THE NEW ZEALAND GAZETTE No. 15
GOODS
- Cement
This section is hereby revoked and the following new section substituted:
-
Cement
-
Cement (except bulk cement in specially constructed containers) in the following minimum loads will be charged at the rates specified in paragraph 2 hereof.
| Each Four Wheeled Wagon | Each Bogie Wagon | |
|---|---|---|
| Tonnes | Tonnes | |
| 12 | 24 |
- Rates—
| Kilometres Not Exceeding | Per Tonne | Kilometres Not Exceeding | Per Tonne | Kilometres Not Exceeding | Per Tonne |
|---|---|---|---|---|---|
| $ | $ | $ | |||
| 65 | 12.66 | 210 | 25.35 | 534 | 42.79 |
| 68 | 12.87 | 218 | 25.95 | 550 | 43.54 |
| 71 | 13.07 | 226 | 26.56 | 566 | 44.30 |
| 74 | 13.28 | 234 | 27.17 | 582 | 45.06 |
| 77 | 13.48 | 242 | 27.78 | 598 | 45.82 |
| 80 | 13.68 | 250 | 28.38 | 614 | 46.58 |
| 83 | 13.89 | 258 | 28.99 | 630 | 47.34 |
| 86 | 14.09 | 266 | 29.60 | 646 | 48.10 |
| 89 | 14.30 | 274 | 30.20 | 662 | 48.86 |
| 92 | 14.50 | 282 | 30.81 | 678 | 49.62 |
| 95 | 14.71 | 290 | 31.42 | 702 | 50.76 |
| 98 | 14.91 | 298 | 31.77 | 726 | 51.90 |
| 101 | 15.11 | 306 | 32.12 | 750 | 53.05 |
| 104 | 15.32 | 314 | 32.46 | 774 | 54.19 |
| 107 | 15.52 | 322 | 32.81 | 798 | 55.34 |
| 110 | 15.73 | 332 | 33.24 | 822 | 56.48 |
| 114 | 16.07 | 342 | 33.68 | 846 | 57.62 |
| 122 | 16.61 | 358 | 34.44 | 870 | 58.77 |
| 130 | 17.14 | 374 | 35.20 | 894 | 59.91 |
| 138 | 17.68 | 390 | 35.95 | 918 | 61.05 |
| 146 | 18.22 | 406 | 36.71 | 942 | 62.20 |
| 154 | 19.11 | 422 | 37.47 | 966 | 63.34 |
| 162 | 20.00 | 438 | 38.23 | 990 | 64.48 |
| 170 | 20.89 | 454 | 38.99 | 1014 | 65.63 |
| 178 | 21.78 | 470 | 39.75 | 1038 | 66.77 |
| 186 | 22.67 | 486 | 40.51 | ||
| 194 | 23.57 | 502 | 41.27 | For each additional 25 km | |
| 202 | 24.46 | 518 | 42.03 | or part thereof $1.19 is to be added. |
-
Minimum charge—Any less quantity than the minimum prescribed will be charged at such minimum or on actual weight at Class E plus 50 percent whichever is cheaper.
-
Bulk cement conveyed in specially constructed containers as approved by the department will be charged as follows:
(a) Conveyed in railway-owned containers on railway-owned wagons. On net weight of cement at the classified rate for cement n.o.s. plus 40 cents per tonne.
(b) Conveyed in privately-owned containers on railway-owned wagons. On net weight of cement at the classified rate for cement n.o.s.
(c) Conveyed in privately-owned containers on privately-owned wagons. On net weight of cement at the classified rate for cement n.o.s. less the following reductions:
| Distance | Reduce Standard Rate by |
|---|---|
| $ | |
| Up to 154 kilometres | 0.57 per tonne |
| 155 to 314 kilometres | 1.12 per tonne |
| 315 to 470 kilometres | 1.79 per tonne |
| 471 to 630 kilometres | 2.26 per tonne |
| 631 kilometres and over | 2.85 per tonne |
-
Cranage—Containers will be craned free of charge.
-
Empty Containers—With the exception of shunting charges to or from private sidings (where applicable), no charge will be made for hauling empty cement containers or wagons.
-
Handling—The department may require all loading and unloading to be performed by the owners.
-
Liability—Cement forwarded under the provisions of this section will be conveyed at owner's risk.
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1980, No 15
NZLII —
NZ Gazette 1980, No 15
✨ LLM interpretation of page content
🚂 Freight Rates for Cement Transportation
🚂 Transport & CommunicationsCement, Freight rates, Railway transportation, Bulk cement, Minimum loads