✨ Transportation Rates for Cement
2882
THE NEW ZEALAND GAZETTE
No. 91
GOODS
-
Cement
This section is hereby revoked and the following new section substituted: -
Cement
-
Cement (except bulk cement in specially constructed containers) in the following minimum loads will be charged at the rates specified in paragraph 2 hereof.
| Each Four Wheeled Wagon | Each Bogie Wagon |
|---|---|
| Tonnes 12 | Tonnes 24 |
- Rates—
| Kilometres Not Exceeding | Per Tonne $ | Kilometres Not Exceeding | Per Tonne $ | Kilometres Not Exceeding | Per Tonne $ |
|---|---|---|---|---|---|
| 65 | 11.51 | 210 | 23.04 | 534 | 38.90 |
| 68 | 11.70 | 218 | 23.59 | 550 | 39.59 |
| 71 | 11.88 | 226 | 24.15 | 566 | 40.28 |
| 74 | 12.07 | 234 | 24.70 | 582 | 40.97 |
| 77 | 12.26 | 242 | 25.25 | 598 | 41.66 |
| 80 | 12.44 | 250 | 25.80 | 614 | 42.35 |
| 83 | 12.63 | 258 | 26.35 | 630 | 43.04 |
| 86 | 12.81 | 266 | 26.91 | 646 | 43.73 |
| 89 | 13.00 | 274 | 27.46 | 662 | 44.42 |
| 92 | 13.18 | 282 | 28.01 | 678 | 45.11 |
| 95 | 13.37 | 290 | 28.56 | 702 | 46.15 |
| 98 | 13.55 | 298 | 28.88 | 726 | 47.19 |
| 101 | 13.74 | 306 | 29.20 | 750 | 48.23 |
| 104 | 13.93 | 314 | 29.51 | 774 | 49.27 |
| 107 | 14.11 | 322 | 29.83 | 798 | 50.31 |
| 110 | 14.30 | 332 | 30.22 | 822 | 51.35 |
| 114 | 14.61 | 342 | 30.62 | 846 | 52.39 |
| 122 | 15.10 | 358 | 31.31 | 870 | 53.42 |
| 130 | 15.59 | 374 | 32.00 | 894 | 54.46 |
| 138 | 16.07 | 390 | 32.69 | 918 | 55.50 |
| 146 | 16.56 | 406 | 33.38 | 942 | 56.54 |
| 154 | 17.37 | 422 | 34.07 | 966 | 57.58 |
| 162 | 18.18 | 438 | 34.76 | 990 | 58.62 |
| 170 | 18.99 | 454 | 35.45 | 1014 | 59.66 |
| 178 | 19.80 | 470 | 36.14 | 1038 | 60.70 |
| 186 | 20.61 | 486 | 36.83 | ||
| 194 | 21.42 | 502 | 37.52 | For each additional 25 km or part thereof $1.08 is to be added. | |
| 202 | 22.23 | 518 | 38.21 |
-
Minimum charge—Any less quantity than the minimum prescribed will be charged at such minimum or on actual weight at Class E plus 50 percent whichever is cheaper.
-
Bulk cement conveyed in specially constructed containers as approved by the department will be charged as follows:
(a) Conveyed in railway-owned containers on railway-owned wagons. On net weight of cement at the classified rate for cement n.o.s. plus 36 cents per tonne.
(b) Conveyed in privately-owned containers on railway-owned wagons. On net weight of cement at the classified rate for cement n.o.s.
(c) Conveyed in privately-owned containers on privately-owned wagons. On net weight of cement at the classified rate for cement n.o.s. less the following reductions:
Distance Reduce Standard Rate by $
Up to 154 kilometres .. 0.52 per tonne
155 to 314 kilometres .. 1.02 per tonne
315 to 470 kilometres .. 1.63 per tonne
471 to 630 kilometres .. 2.05 per tonne
631 kilometres and over .. 2.59 per tonne
-
Cranage—Containers will be craned free of charge.
-
Empty Containers—With the exception of shunting charges to or from private sidings (where applicable), no charge will be made for hauling empty cement containers or wagons.
-
Handling—The department may require all loading and unloading to be performed by the owners.
-
Liability—Cement forwarded under the provisions of this section will be conveyed at owner’s risk.
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1979, No 91
NZLII —
NZ Gazette 1979, No 91
✨ LLM interpretation of page content
🚂 Transportation Rates for Cement
🚂 Transport & CommunicationsTransportation Rates, Cement, Kilometres, Weight, Minimum Loads