✨ Banking Regulations and Contract Awards
528
THE NEW ZEALAND GAZETTE
No. 17
(a) in the case of a borrowing made during a
calendar month to make up balances and holdings
for that calendar month, be included in the balances
held by that trading bank at the Reserve Bank
during the calendar month for which that borrowing
is made; and
(b) that in the case of a borrowing made during
the first 10 business days of a calendar month to
make up balances and holdings for the preceding
calendar month, be deemed to be a part of and be
included in the balance held by that trading bank
at the Reserve Bank on the last day of the preceding
calendar month;
and the proceeds of any such borrowing shall not be
included in the balances held by that trading bank at
the Reserve Bank during any other calendar month.
R. W. R. WHITE, Governor.
26 February 1979.
Ministry of Works and Development—Schedule of Civil Engineering and Building Contracts of $20,000 or More in Value
| Name of Works | Successful Tenderer | Amount of Tender Accepted $ |
|---|---|---|
| Civil Engineering— | ||
| Whangaparaoa Military Camp: upgrading of access road | Hopper Construction Ltd. | 24,776.40 |
| Construction of hardstand area and wheel aligner pit: Ministry of Works and Development Depot, Alexandra | Adrian Kroon Ltd. | 27,497.50 |
| S.H. 12: Roto Bridge renewal | Hector Busby | 29,842.85 |
| S.H. 1 and 16: Takapuna Residency: bitumen sealing | Emoleum (N.Z.) Ltd. | 43,040.82 |
| S.H. 1 and 47: Taumarunui Residency: intersection reconstruction | Winstone Civil Construction Ltd. | 50,978.10 |
| Hot dip galvanising of 150 mm NB steel pipe for Wairakei Geothermal Project | Hot Dip Galvanisers Ltd. | 52,626.67 |
| Lower Waitaki Irrigation Scheme: coastal bywash structure | R. A. Winsley Ltd. | 53,610.92 |
| NZED: Second coat sealing of Mararoa dam site access road | Bitumen Distributors (Southland) Ltd. | 53,656.00 |
| Lower Waitaki Irrigation Scheme: Pukeuri Distributary Race No. 3 | Doug Hood Ltd. | 56,351.47 |
| S.H. 1: Carterhope No. 2 section: lime stabilisation, shoulder drainage, and sealing work | Fulton Hogan Ltd. | 57,556.23 |
| Auckland–Whenuapai Motorway: friction course surfacing | Reliable Roads Ltd. | 62,227.00 |
| S.H. 1: East Taieri: shape correction, shoulder, and sealing work | Fairfield Asphalt Co. Ltd. | 98,510.20 |
| Lands and Survey: Waitara six bridge construction | Dale Construction and Developments Ltd. | 98,613.20 |
| Maui Pipeline Project: additions to Oaonui Station | de Ville Contractors Ltd. | 105,205.00 |
| S.H. 6: Lyell Creek culvert approaches: construction of earthworks, base-course, and guardrailing | Highways Construction (Nelson) Ltd. | 108,737.80 |
| S.H. 1: R.D. 16: RS 583: reconstruction Weston Road–Maudes Road section: earthworks, drainage, pavement, and seal | J. R. Bishop Ltd. | 111,718.80 |
| Waiau Plains Irrigation Scheme: main race, stage 2 | New Brighton Contractors Ltd. | 126,358.40 |
| Flood damage restoration: Haast—S.H. 6 | Contract Cultivation Ltd. | 141,885.00 |
| S.H. 2: Hamua Gorge improvements | Oldfield Asphalts Ltd. | 198,029.40 |
| Meola Creek diversion culvert: Auckland–Whenuapai Motorway | W. Stevenson and Sons Ltd. | 362,620.70 |
| Ohai, Southland: stripping of overburden No. 16 opencast mine | Herron Contracting Co. Ltd. | 736,847.00 |
| Building— | ||
| Kapuni Gas Treatment Plant: relocation of vessels and foundations | H. F. Snowden Construction Ltd. | 21,450.00 |
| Lift maintenance various Government Buildings, Wellington | Otis Elevator Co. Ltd. | 21,575.00 |
| State Services Commission: Public Trust Building, Levin: alterations for Justice and Agriculture and Fisheries Departments | Sissons and Sim Ltd. | 23,890.00 |
| Papakura Military Camp: barrack and ablution blocks 39, 40, 49, and 50 heating | David Gordon Ltd. | 27,229.00 |
| Otago Boy’s High School: construction of tennis courts | Fairfield Asphalt Co. Ltd. | 46,737.10 |
| Tokomaru Bay Fire Station | E. A. Forrest Ltd. | 51,116.28 |
| Tikiti Fire Station | T. A. Taylor | 55,300.00 |
| Tolaga Bay District High School: heating system | J. Harries and Co. Ltd. | 60,688.00 |
| Relocation and alterations to crash fire garages: Invercargill Airport | R. W. Firman Ltd. | 82,817.44 |
| Central Hawkes Bay College: work experience block | W. E. Mathieson | 63,272.00 |
| NZED Hamilton: extension to No. 2 store | Durney Construction Co. Ltd. | 93,030.00 |
| Additions and alterations to Taupo Fire Station for N.Z. Fire Service | Holman Construction Ltd. | 125,987.00 |
| Cambridge High School: block 15, stage I | D. J. Mackersy Ltd. | 196,501.00 |
| Ministry of Works and Development Depot, Higgins Road, Hamilton: light plant wing | Taupo Totara Timber Co. Ltd. | 215,014.72 |
| Concrete Construction Co. Ltd. | 275,533.33 |
N. C. McLEOD, Commissioner of Works.
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1979, No 17
NZLII —
NZ Gazette 1979, No 17
✨ LLM interpretation of page content
💰
Trading Bank Reserve Asset Ratios
(continued from previous page)
💰 Finance & Revenue26 February 1979
Reserve Bank, Trading Banks, Asset Ratios, Banking Regulations
- R. W. R. White, Governor
🏗️ Schedule of Civil Engineering and Building Contracts
🏗️ Infrastructure & Public WorksConstruction, Engineering, Building, Contracts, Ministry of Works
- N. C. McLeod, Commissioner of Works