Freight Rates for Petroleum Products




1834
THE NEW ZEALAND GAZETTE
No. 58

GOODS

  1. Petroleum Products in Rail Tank Wagons

This section is revoked and the following new section substituted therefor:

  1. Petroleum Products in Rail Tank Wagons

  2. The charges for the conveyance of petroleum products in Uc and Mcp tank wagons will be as under:

Kilometres Not Exceeding Petrol, Kerosene, and Similar Mineral Oils Weighing less than 800g per litre Crude Residual, Lubricating, Transformer, or Fuel Oils Weighing 800g or More per litre Kilometres Not Exceeding Petrol, Kerosene, and Similar Mineral Oils Weighing less than 800g per litre Crude Residual, Lubricating, Transformer, or Fuel Oils Weighing 800g or More per litre
Rate per Tonne $ Rate per Tonne $ Rate per Tonne $ Rate per Tonne $
65 13.39 13.02 306 33.97 33.03
68 13.61 13.23 314 34.34 33.38
71 31.82 13.44 322 34.70 33.74
74 14.04 13.65 332 35.16 34.19
77 14.26 13.86 342 35.63 34.64
80 14.47 14.07 358 36.43 35.42
83 14.69 14.28 374 37.23 36.20
86 14.90 14.49 390 38.04 36.98
89 15.12 14.70 406 38.84 37.76
92 15.34 14.91 422 39.64 38.54
95 15.55 15.12 438 40.44 39.32
98 15.77 15.33 454 41.25 40.10
101 15.98 15.54 470 42.05 40.88
104 16.20 15.75 486 42.85 41.66
107 16.42 15.96 502 43.65 42.44
110 16.63 16.17 518 44.46 43.23
114 16.99 16.52 534 45.26 44.00
122 17.56 17.07 550 46.07 44.79
130 18.13 17.63 566 46.86 45.56
138 18.70 18.18 582 47.67 46.35
146 19.27 18.73 598 48.47 47.12
154 20.21 19.65 614 49.28 47.91
162 21.15 20.57 630 50.08 48.69
170 22.10 21.48 646 50.88 49.47
178 23.04 22.40 662 51.68 50.25
186 23.98 23.32 678 52.49 51.03
194 24.93 24.23 694 53.70 52.21
202 25.87 25.15 702 54.91 53.38
210 26.81 26.07 726 56.12 54.56
218 27.45 26.69 750 57.33 55.73
226 28.09 27.31 774 58.54 56.91
234 28.74 27.94 798 59.75 58.09
242 29.38 28.56 822 60.96 59.26
250 30.02 29.19 846 62.16 60.44
258 30.66 29.81 870 63.37 61.61
266 31.31 30.44 894 64.58 62.79
274 31.95 31.06 918 65.79 63.97
282 32.59 31.68 942 67.00 65.14
290 33.23 32.31 966 68.21 66.32
298 33.60 32.66 990 69.42 67.49
1014 70.63 68.67
  1. All tank wagons are to be loaded to their full carrying capacity.

  2. With the exception of shunting charges to or from private sidings (where applicable), no charge will be made for hauling empty tank wagons.

  3. All tank wagons are to be loaded and unloaded by owners and will be conveyed at owner’s risk.



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1978, No 58


NZLII PDF NZ Gazette 1978, No 58





✨ LLM interpretation of page content

🚂 Revised Freight Rates for Petroleum Products (continued from previous page)

🚂 Transport & Communications
Freight, Petroleum Products, Rates, Kilometres, Tonne, Rail Tank Wagons