✨ Electric Power Licence




Authorizing the Otago Central Electric-power Board to Use Water
from the Fraser River for the Purpose of Generating Electricity
and to Construct, Maintain, and Use Electric Lines and Works
in the County of Vincent

B. C. FREYBERG, Governor-General
ORDER IN COUNCIL
At the Government Buildings at Wellington, this 20th day of
April, 1949
Present:
THE RIGHT HON. W. NASH PRESIDING IN COUNCIL
PURSUANT to the Public Works Act, 1928, and the Electric-
power Boards Act, 1925, His Excellency the Governor-
General, acting by and with the advice and consent of the Executive
Council, doth hereby grant to the Otago Central Electric-power
Board (hereinafter referred to as the licensee) a licence subject to
the terms and conditions set forth in the First Schedule hereto,
to take and use from the Fraser River (hereinafter referred to as
the said stream), at a point approximately one mile below the
confluence of the said stream with the Hawksburn River in the
County of Vincent, Otago Land District, for the purpose herein-
after set forth, a stream of water not exceeding 60 cubic feet per
second at any one time; and, further doth, subject to the said
terms and conditions in the First Schedule hereto, hereby authorize
the licensee to lay, construct, put up, place, and use the electric
lines described in the Second Schedule hereto; and, further, for
the purposes of section seventy-six of the Electric-power Boards
Act, 1925, doth hereby authorize the licensee to construct, maintain,
and use the said electric works.

FIRST SCHEDULE

  1. IMPLIED CONDITIONS
    The conditions directed to be implied in all licences by the Electrical
    Supply Regulations 1935, and the Electrical Wiring Regulations
    1935, and by Regulation 6 of the Water-power Regulations 1934,
    shall be incorporated in and shall form part of this licence, except
    in so far as the same may be inconsistent with the provisions hereof,
    or with the provisions of the agreements, dated the 22nd day of
    July, 1947, hereinafter referred to, or of any agreements made or
    to be made in amendment thereof, or in substitution therefor.
  2. LICENCE SUBJECT TO REGULATIONS
    This licence is issued under the Water-power Regulations 1934,
    and is subject thereto, and to the Electrical Supply Regulations
    1935, the Electrical Wiring Regulations 1935, and the Radio Inter-
    ference Regulations 1934, and to any regulations made or to be
    made in amplification or amendment thereof or in substitution
    therefor.
  3. LICENCE COLLATERAL AND CONCURRENT WITH AGREEMENTS
    Subject as hereinafter appears, this licence shall constitute a
    contract between His Majesty the King and the licensee collateral
    with certain other agreements, collateral the one with the other,
    and bearing date the 22nd day of July, 1947, and made between the
    Minister of Works, acting for and on behalf of His Majesty the King
    of the one part, and the licensee of the other part, the provisions
    of which agreements shall be read together with and deemed to
    be part of this licence, and of which agreements copies have been
    deposited in the office of the Minister of Works at Wellington.
    This licence shall be concurrent with and supplementary to the
    said agreements and the provisions hereof shall be subject to the
    terms and conditions of the said agreements and of any agreements
    made or to be made in amendment thereof or in substitution
    therefor.
  4. UTILIZATION OF WATER AND LOCATION OF HEADWORKS
    Water shall be used under this licence solely for the purpose
    of generating electricity up to a maximum capacity of 3,000 kilo-
    watts and shall be taken from the said stream at the headworks,
    situated in Run 249, Block XIV, Leaning Rock Survey District,
    as indicated on the plan marked S.H.D. 66, deposited in the office
    of the Minister in Charge of the State Hydro-electric Department.
  5. GENERAL DESCRIPTION OF WORKS
    (1) The licensee is hereby authorized, subject to the conditions
    herein contained or implied, to maintain, operate, and use the
    following works for the purposes of this licence:-
    (a) Headworks consisting of a diversion weir and necessary
    intake below the dam constructed by the Minister of
    Works, giving a static head of approximately 810 ft.
    as indicated on the said plan S.H.D. 66.
    (b) Pipe-lines leading from the intake to the power-house next
    hereinafter referred to.
    (2) The licensee is hereby authorized, subject to the conditions
    herein contained or implied, to construct, maintain, operate, and
    use the following works for the purposes of this licence:-
    (a) Power-house situated on River Reserve, Block X, Leaning
    Rock Survey District, or on Run 249 adjacent thereto,
    with all necessary equipment for generating electricity.
    (b) Tail-race leading from the aforesaid power-house to the
    existing irrigation system of the Minister of Works.
    (c) The electric-lines described in the Second Schedule hereto.
  6. TEMPORARY PLANT
    Pending the completion of the works described in clause 5
    hereof, the licensee is hereby authorized, subject to the conditions
    herein contained or implied, to maintain, operate, and use the
    following works for the purposes of this licence, the positions of
    the works described in subclause (1) hereof being indicated on the
    said plan S.H.D. 66:-
    (1) (a) Pipe-lines leading from the intake hereinbefore referred
    to, to the power-house next hereinafter referred to.
    (b) Pelton wheel and power-house situated in Run 249,
    Block X, Leaning Rock Survey District, with all
    necessary equipment for generating electricity, with
    a generating voltage of 400 volts, a maximum rated
    capacity of 500 kilowatts, and a static head of
    approximately 350 ft.
    (c) Tailrace leading from the aforesaid power-house to
    the existing irrigation system of the Minister of
    Works.
    (2) (a) Pipe-lines leading from the intake hereinbefore referred
    to, to the power-house hereinafter referred to.
    (b) Water turbine and power-house situated in the said
    Run 249, with all necessary equipment for generating
    electricity, with a generating voltage of 5,400 volts,
    and a maximum generating capacity of approximately
    400 kilowatts.
    (c) Tailrace leading from the last-mentioned power-house
    to the existing irrigation system of the Minister of
    Works.
  7. PLANS
    Before any of the works described in clauses 5 and 6 hereof,
    and which have not already been constructed, are commenced,
    the licensee shall submit to the Minister in Charge of the State
    Hydro-electric Department, locality plans showing the positions
    of the said works, in addition to any other plans and drawings
    required under the Water-power Regulations 1934, or under the
    agreements hereinbefore referred to.
  8. SYSTEM OF SUPPLY
    The system of supply shall be as described in paragraph (f)
    of clause 21-01 of the Electrical Supply Regulations 1935. The
    generating voltage shall be 6,600 volts between terminals (except
    with regard to the temporary plant described in clause 6 hereof)
    and the transmission voltage shall be 33,000 volts between phases.
  9. CHARGES FOR ELECTRICAL ENERGY
    The licensee shall not in respect of electrical energy generated
    under the authority of this licence make any charge exceeding the
    corresponding charge which the licensee may from time to time be
    duly authorized to make in respect of electrical energy obtained
    by the licensee from other sources and distributed within the Otago
    Central Electric-power District.
    10 DURATION OF LICENCE
    This licence shall, unless sooner lawfully determined, continue
    in force for a period of twenty-five years from the date of the
    completion of the works hereby authorized to be constructed but,
    in so far as it authorizes the use of the works described in clause 6
    hereof, shall cease and determine when the works described in
    subclause (2) of clause 5 hereof have commenced generating electricity
    after completion of testing.
  10. RENTAL
    The rental or annual sum payable in respect of this licence in
    accordance with the Water-power Regulations 1934, shall be assessed
    at the rate of Β£1 per kilowatt per annum, or such lesser rate as may
    be fixed after compliance by the licensee with the said regulations,
    on the half-hourly maximum kilowatt demand for the year of the
    licensee, as determined or assessed by agreement between the licensee
    and the Minister in Charge of the State Hydro-electric Department.
  11. TIME FOR COMPLETION OF WORKS
    The period for completion of the works hereby authorized
    shall be four years from the date of this licence.
  12. NO RIGHT TO WATER CONFERRED
    This licence shall not, of itself, confer upon the licensee any
    right to water.
    SECOND SCHEDULE
    Electric lines leading from the aforesaid power-houses across
    Section 17, Block X, Leaning Rock Survey District, to the licensee's
    existing transmission line on the Earnscleugh-Clyde Main Road,
    Block X, Leaning Rock Survey District, the electric lines now
    proposed to be erected and used being indicated by blue lines on
    the aforesaid plan S.H.D. 66.
    T. J. SHERRARD,
    Clerk of the Executive Council.
    (S.H.D. 10/44/1.)


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1949, No 26


NZLII PDF NZ Gazette 1949, No 26





✨ LLM interpretation of page content

πŸ—οΈ Licence for Otago Central Electric-power Board to Use Fraser River Water

πŸ—οΈ Infrastructure & Public Works
20 April 1949
Electricity generation, Water use, Fraser River, Otago Central Electric-power Board, Public Works Act
  • B. C. Freyberg, Governor-General
  • The Right Hon. W. Nash, Presiding in Council
  • T. J. Sherrard, Clerk of the Executive Council