β¨ Electric Line Licenses
366
said Board or the Crown, as the case may be, and the licensee;
and, failing such agreement, at a valuation to be fixed by a
single arbitrator to be appointed pursuant to the provisions
of the Arbitration Act, 1908, and thereupon the Governor-
General may by Order in Council revoke this license.
7. EFFECT OF DETERMINATION OF LICENSE.
The determination of this license, whether by expiration
of time, surrender, or by revocation as aforesaid, shall not
relieve the licensee from any liability theretofore incurred
under this license.
8. RAILWAY AND TELEGRAPH LINES.
The licensee shall, from time to time, rectify to the satis-
faction of the Government Railways Board and Minister of
Telegraphs respectively, any interference or disturbance
caused by the erection or operation of the licensee's system
that affects the satisfactory working of any telegraph-line
which is under the control of or in use by the Railways
Department and the Post and Telegraph Department
respectively, and which was erected before the erection of
the lines hereby licensed.
9. REQUIREMENTS OF THE BULLER COUNTY COUNCIL.
Notwithstanding anything hereinbefore contained, the
licensee shall not, by virtue of these presents, be entitled to
lay, construct, put up, place, or use the electric lines hereby
authorized except subject to such conditions, not incon-
sistent with the provisions of this license or of the said
regulations or any regulations hereafter made in amendment
thereof or in substitution therefor, as may from time to
time lawfully be imposed by the Buller County Council.
10. ROUTES RESERVED FOR GOVERNMENT LINES.
Notwithstanding anything hereinbefore contained the
licensee shall not, without the consent in writing of the
Minister of Public Works, erect any electric lines along the
routes of the Government main trunk transmission-lines.
SCHEDULE.
Lines adapted for supply as prescribed in these presents for
the transmission of electricity commencing from the generating
station on Lot 3, D.P. 268, Section 36, Square 152, Block XIV,
Oparara Survey District, and proceeding thence across
Lots 3, 2, and 1 on the said D.P. 268 on to Bridge Street;
thence in a north-westerly direction along Bridge Street to a
point opposite Section 28 with branch lines to Lot 8, D.P. 1680,
Section 35, to Lots 2 and 1, D.P. 268, Section 36, to part 35,
D.P. 1009, to Lot 7, D.P. 1680, Section 35, to part 35,
plan 982/681, and to Sections 28, 19, and 34, all situate in
Square 152, Block XIV, Oparara Survey District. As the
same is more particularly delineated on the plans marked
P.W.D. 85184 and 84568, deposited in the office of the
Minister of Public Works at Wellington.
F. D. THOMSON,
Clerk of the Executive Council.
(P.W. 26/1519.)
License authorizing Wallace Supplies, Limited, of Ruawai, to
erect Electric Lines in Portion of the County of Otamatea.
BLEDISLOE, Governor-General.
ORDER IN COUNCIL.
At the Government House at Wellington, this 28th day of
February, 1933.
Present:
His Excellency The Governor-General in Council.
IN pursuance and exercise of the powers conferred by the
Public Works Act, 1928, and of all other powers in
anywise enabling him in that behalf, His Excellency the
Governor-General of the Dominion of New Zealand, acting
by and with the advice and consent of the Executive Council
of the said Dominion, doth hereby authorize Wallace Supplies,
Limited, a limited liability company having its registered
office at Ruawai, to lay, construct, put up, place, and use the
electric lines described in the Schedule hereto on the following
conditions.
CONDITIONS.
- PURPOSES OF LINES.
THE said lines may be used for lighting, power, and heating
purposes.
[No. 13
2. LICENSE TO BE SUBJECT TO REGULATIONS.
The license hereby conferred is subject to compliance by
the licensee with the Electrical Supply Regulations, 1927,
the Electrical Wiring Regulation, 1927, and with all regulations
made or to be made in amendment thereof or in substitution
therefor.
3. SYSTEM OF SUPPLY.
The system of supply shall be the system described in
paragraph (c) of clause 5 of the Electrical Supply Regulations,
1927.
4. GENERATING VOLTAGE.
Electrical energy shall be generated at a pressure of 32
volts between terminals.
5. DURATION OF LICENSE.
This license shall, unless sooner determined, whether by
surrender by the licensee or by revocation under the provisions
contained in the said regulations or in any amending or
substituted regulations, continue in force for a period of
twenty-one years from the date hereof.
6. PURCHASE OF INSTALLATION BY ELECTRIC-POWER BOARD
OR CROWN.
Subject to the provisions of the Electric-power Boards
Act, 1925, or any Act passed in amendment thereof or in
substitution therefor, any Electric-power Board duly con-
stituted in terms of the Electric-power Boards Act, 1925, or
any Act passed in amendment thereof or in substitution there-
for, if its district or outer area shall include the area in which
are erected the lines described in the Schedule hereto, or the
Crown, shall have the right, at any time during the currency
of this license, to purchase and take over the licensee's in-
stallation at a valuation to be agreed upon between the said
Board or the Crown, as the case may be, and the licensee;
and, failing such agreement, at a valuation to be fixed by a
single arbitrator to be appointed pursuant to the provisions
of the Arbitration Act, 1908, and thereupon the Governor-
General may by Order in Council revoke this license.
7. EFFECT OF DETERMINATION OF LICENSE.
The determination of this license, whether by expiration
of time, by surrender, or by revocation as aforesaid, shall not
relieve the licensee from any liability theretofore incurred
under this license.
8. RAILWAY AND TELEGRAPH LINES.
The licensee shall, from time to time, rectify to the satis-
faction of the Government Railways Board and the Minister
of Telegraphs respectively, any interference or disturbance
caused by the erection or operation of the licensee's system
that affects the satisfactory working of any telegraph-line
which is under the control of or in use by the Railways De-
partment and the Post and Telegraph Department respec-
tively, and which was erected before the erection of the
lines hereby licensed.
9. REQUIREMENTS OF OTAMATEA COUNTY COUNCIL.
Notwithstanding anything hereinbefore contained, the
licensee shall not, by virtue of these presents, be entitled to
lay, construct, put up, place, or use the electric lines hereby
authorized except subject to such conditions, not inconsistent
with the provisions of this license or of the said regulations
or any regulations hereafter made in amendment thereof or
in substitution therefor, as may from time to time lawfully
be imposed by the Otamatea County Council.
10. ROUTES RESERVED FOR GOVERNMENT LINES.
Notwithstanding anything hereinbefore contained the
licensee shall not, without the consent in writing of the
Minister of Public Works, erect any electric lines along the
routes of the Government main trunk transmission-lines.
11. CHARGES FOR ELECTRICAL ENERGY.
The charges for electrical energy shall not exceed 1s. per
unit for lighting purposes and 6d. per unit for motor-power,
heating, or cooking purposes: Provided that "lighting
purposes" shall include the operation of motor generators
for lighting purposes.
SCHEDULE.
Lines adapted for supply as prescribed in these presents for
the transmission of electricity from the power-house situated on
Lot 7, and proceeding thence across Lots 7, 8, 16, 17, and 18
to the residence on Lot 18, the said lots all being portions of
the land shown on D.P. 9765, and being portions of Section
46, Block XV, Tokatoka Survey District. As the same are
more particularly delineated on the plan marked P.W.D.
84982, deposited in the office of the Minister of Public Works
at Wellington, and thereon coloured red.
F. D. THOMSON,
Clerk of the Executive Council.
(P.W. 26/1796.)
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1933, No 13
NZLII —
NZ Gazette 1933, No 13
β¨ LLM interpretation of page content
ποΈ
License to Erect Electric Lines in Buller County
(continued from previous page)
ποΈ Infrastructure & Public Works28 February 1933
Electric Lines, License, Buller County, Public Works Act
- F. D. Thomson, Clerk of the Executive Council
ποΈ License authorizing Wallace Supplies, Limited, to erect Electric Lines in Portion of the County of Otamatea
ποΈ Infrastructure & Public Works28 February 1933
Electric Lines, License, Otamatea County, Public Works Act
- F. D. Thomson, Clerk of the Executive Council