Public Works and Land Orders




JULY 8.] THE NEW ZEALAND GAZETTE. 1881

twelfth day of the same month, or any regulations hereafter
made in amendment thereof or in substitution therefor (and
hereinafter collectively referred to as "the regulations"), and
which regulations shall be deemed to be incorporated herein—
hereby authorize the Grey Electric-power Board, being an
electric-power Board constituted under the provisions of the
Electric-power Boards Act, 1918 (hereinafter with its successors and assigns referred to as "the licensee") to use electric
lines for power, lighting, heating, or other uses within the
Grey Electric-power District and outer area, as defined by
Proclamation dated the twentieth day of October, one thousand nine hundred and twenty-two, and published in the New
Zealand Gazette No. 76, of the twenty-sixth day of October,
one thousand nine hundred and twenty-two; such electric
lines at present proposed to be used being indicated on the
plan marked P.W.D. 65102, and deposited in the office of the
Minister of Public Works at Wellington, in the Wellington
Land District.

SCHEDULE.

  1. SYSTEM OF SUPPLY.
    The system of supply shall be as described in paragraph (e)
    of clause 2 of the regulations.
    The generating voltage shall be approximately 6,600 volts
    between the terminals, and transformed to 11,000 volts for
    transmission.

  2. MAINTENANCE OF WORKS.
    The licensee shall maintain the works used under this
    license in proper working-order during the continuance of
    such license.

  3. DURATION OF LICENSE.
    This license shall, unless sooner determined in accordance
    with the provisions hereinafter expressed, continue in force
    for a period of forty-two years from the date hereof. Upon
    the expiry of the said term, or upon the sooner determination
    of this license by revocation or otherwise, all rights hereby
    granted to the licensee shall thereupon cease and determine,
    but such expiration or determination shall not relieve the
    licensee of any liability theretofore incurred under this license.

  4. CHARGES FOR ELECTRICAL ENERGY.
    The charges for electrical energy shall not exceed 1s. per
    unit for lighting purposes, and 6d. per unit for motor-power,
    heating, or cooking purposes; provided that "lighting purposes" shall include the operation of motor generators for
    lighting purposes; and provided further that if accounts are
    paid within fourteen days of due date the charges shall not
    exceed 9d. per unit for lighting purposes and 4½d. per unit
    for motor-power, cooking, and heating purposes.

In the case of wholesale supply the charge shall not exceed
£16 per kilovolt-ampere per year plus ½d. per unit. Wholesale
supply for this purpose shall be held to be a supply in
respect of which the consumer shall guarantee to pay not less
than £180 per annum.

  1. INTERCHANGE OF SUPPLY OF ELECTRICAL ENERGY.
    (a.) In the event of the Minister establishing a hydro-electric-power scheme outside the area of supply of a frequency of 50 cycles per second on the three-phase-alternating-current system, he may require the licensee to connect that
    scheme with the licensee's electrical system in such a manner
    that an interchange of electrical energy between the two
    systems may be made from time to time and when required
    by either the licensee or the Minister, up to at least one-half
    of the total capacity of the plant installed at the licensee's
    power-house.

(b.) The licensee shall erect and maintain in good order, at
the expense of the licensee, the necessary transmission-lines
between the licensee's power-house and a point on the boundary of the area of supply to be determined by the Minister.

(c.) The Minister shall erect and maintain in good order, at
the expense of the Minister, the necessary transmission-lines
outside the area of supply for the purpose of connecting the
two systems at the point last mentioned in subclause (b)
hereof.

(d.) The licensee and the Minister respectively shall, on
demand, and from time to time as and when required, supply
to each other so much of the surplus electrical energy as is
then required and is available, but not in excess of one-half
of the capacity of the plant installed in the licensee's powerhouse.

(e.) The price to be paid by the licensee or the Minister
shall not exceed the following rates:—
Between the hours of 8 a.m. and 8 p.m. daily: 1d. per
unit.
Between the hours of 8 p.m. and 8 a.m. daily: ½d. per
unit.

To be measured in each case at the point last mentioned in
subclause (b) hereof.
(f.) For the purpose of this clause, either the licensee or
the Minister may have the unit measured in kilovolt-amperes
hours instead of kilowatt hours.

  1. CONVERSION OF LINES FROM EARTH-WORKING TO METALLIC.
    Notwithstanding anything herein contained, the licensee
    shall bear the cost of converting the Railway and Post or
    Telegraph Department’s lines which are now erected from
    earth-working to metallic, if required by the Minister of
    Railways or Telegraphs owing to electrical interference
    arising from the licensee’s lines.

  2. RAILWAY OR TELEGRAPH DEPARTMENT'S LINES.
    The licensee shall rectify to the satisfaction of the Minister
    of Railways or Telegraphs any interference or disturbance
    caused by the erection or operation of the licensee's system
    that affects the satisfactory working of telegraph-lines which
    are the property of the Railway or Telegraph Department,
    and which were erected prior to the licensee's lines.

  3. LOCATION OF OVERHEAD LINES.
    Notwithstanding anything herein contained, one side of
    every road or street shall be left free by the licensee for
    telegraph-lines. Lines shall not be erected on both sides
    of the street, unless the permission of the Minister of Telegraphs or the Post and Telegraph Department is first obtained
    in accordance with clause 5 of the regulations. Except at
    crossing-places, the minimum separation between a telephone-line and poles carrying high or extra-high tension circuits
    shall be equal to the height of the taller pole, provided that
    where the minimum separation is unobtainable the licensee
    shall bear the cost of any special protection deemed necessary
    by the Minister of Telegraphs.

  4. ERECTION OF POWER-LINES.
    The erection of power-lines on or adjacent to the route of
    the extra-high-pressure lines, as indicated on drawings 54,
    55, and 56 of the said plan P.W.;D. 65102, shall be subject to
    arrangements made on the spot by the licensee's engineer
    to the satisfaction of the Telegraph Engineer.

F. D. THOMSON,
Clerk of the Executive Council.
P.W. 26/1090/1.)

Vesting a Gravel Reserve in the Ellesmere County Council.

CHARLES FERGUSSON, Governor-General.
ORDER IN COUNCIL.
At the Government House at Wellington, this 5th day of
July, 1926.
Present:
His Excellency the Governor-General in Council.
WHEREAS the land described in the Schedule hereto
has been duly set apart as a reserve for gravel purposes: And whereas, in the opinion of the Governor-General, it is expedient to vest the said reserve in the Chairman,
Councillors, and Inhabitants of the County of Ellesmere.
Now, therefore, His Excellency the Governor-General of
the Dominion of New Zealand, acting by and with the advice
and consent of the Executive Council of the said Dominion,
and in exercise of the powers and authorities conferred upon
him by section four of the Public Reserves and Domains Act,
1908, doth hereby declare that, from and after the day of the
date hereof, the reserve described in the Schedule hereto shall
become vested in the Chairman, Councillors, and Inhabitants
of the County of Ellesmere, in trust, as a reserve for gravel
purposes.

SCHEDULE.

All that area in the Canterbury Land District, containing by
admeasurement 4 acres, more or less, being Reserve 4145,
formerly part of Reserve 1435, Block I, Southbridge Survey
District, commencing at a point on the north-west side of
the Southbridge-Leeston Road, 768.8 links from the southern-
most corner of Reserve 1435, thence north-west at a right
angle, 400 links ; thence south-west at a right angle, 400 links;
thence north-west at a right angle, 400 links; thence north-east at a right angle, 700 links; thence south-east at a right



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1926, No 46


NZLII PDF NZ Gazette 1926, No 46





✨ LLM interpretation of page content

🏗️ License authorizing the Grey Electric-power Board to use Electric Lines (continued from previous page)

🏗️ Infrastructure & Public Works
5 July 1926
Electric power, License, Public Works Act, Grey Electric-power Board, Regulations, Charges, Maintenance
  • F. D. Thomson, Clerk of the Executive Council

🗺️ Vesting a Gravel Reserve in the Ellesmere County Council

🗺️ Lands, Settlement & Survey
5 July 1926
Gravel reserve, Vesting, Ellesmere County Council, Public Reserves and Domains Act
  • Charles Fergusson, Governor-General