✨ Electric Supply Authority Details
1498
THE NEW ZEALAND GAZETTE.
[No. 36
- System employed: D.C. Two wire. A.C. Single phase.
Three ,, Three ,,
Frequency: cycles.
[Strike out lines not applicable.]
- Water-turbines and Pelton wheels .. Number
- Boilers .. Number
- Engines—
Steam .. Number
Gas .. Number
Oil .. Number - Generators (excluding exciters) Number
| Main Plant. | Standby Plant. | — | Main Plant. | Standby Plant. |
|---|---|---|---|---|
| B.H.P. | ||||
| H.P. | ||||
| B.H.P. | ||||
| B.H.P. | ||||
| B.H.P. | ||||
| *K.V.A. |
-
Power used to drive auxiliaries (electricity, steam, gas, oil, or water):
-
Static head (water-power plants): feet.
-
Fuel used during year—Nature (coal, coke, or oil): Quantity (tons):
-
Voltage—
(a.) Generator .. .. Volts:
(b.) Transmission-lines .. .. Volts:
(c.) Primary reticulation-lines .. .. Volts:
(d.) Secondary reticulation-lines .. .. Volts: -
Connections—
(a.) Generator .. .. Star or delta:
(b.) Overhead lines (on side connected to lines—
(i.) Transmission-lines Star or delta:
(ii.) Primary reticulation-lines .. Star or delta:
(iii.) Secondary reticulation-lines .. Star or delta:
[State whether operated with earthed or isolated neutral.] -
Route-miles of lines—
| Erected during current Year. | Total erected to 31/3/ | |
|---|---|---|
| (a.) Transmission (overhead lines) Miles: | ||
| (b.) Distribution (overhead lines) Miles: | ||
| (c.) Underground cables .. Miles: | ||
| Total .. .. Miles: |
NOTE.—The mileage of distribution-lines carried on same poles as transmission-lines must NOT be included.
-
Maximum load observed during the year Kws.:
-
Date and hour of above maximum load:
-
Total units generated or purchased in bulk during year—
Generated .. .. .. ..
Purchased .. .. .. ..
Total .. .. .. .. -
Total units sold during year (total of sections 38 (c), 39 (c), 40 (c), 41 (a), 42 (a), and 43 (a)) .. ..
-
Total units lost or non-productive during year (difference between sections 22 and 23) .. ..
-
Ratio of non-productive units to total generated and/or purchased units (section 24 × 100) Per cent:
section 22 × 1 -
Annual load factor—i.e., ratio of average load to maximum load (section 22 × 100) Per cent:
section 20 × 8760 -
(a.) Total connected load in kilowatts (total of sections 38 (b), 39 (b), 40 (b), 41 (e), 42 (d), and 43 (d)) .. .. .. Kilowatts:
(b.) Diversity factor—i.e., ratio of total connected load in kilowatts to maximum load in kilowatts (section 27(a)) .. .. .. ..
section 20
- Total revenue for year—
(a.) Sale of energy (total of sections 38 (d), 39 (d), 40 (d), 41 (b), 42 (b), and 43 (b)) —i.e., gross revenue EARNED .. £
(b.) Hire of apparatus (meter-rents, &c.) .. £
(c.) Profits from sale of supplies, wiring, fittings, and repairs .. £
(d.) Miscellaneous revenue (if any) .. £
(e.) Interest .. .. .. .. £
Total revenue .. .. £
(f.) Average revenue from sale of energy per unit sold (section 28 (a)) Pence:
section 23
(g.) Average revenue from sale of energy per kilowatt of maximum load (section 28 (a)) .. .. £
section 20
(h.) Rates collected .. .. .. .. £
-
Operating expenditure for year—
(a.) To cost of power purchased in bulk .. £
(b.) To cost of generation (including proportion of wages (section 2 (b)) .. £
(c.) To fuel .. .. .. .. £
(d.) To stores, &c. (Generating and distribution stores to be shown separately where possible) .. .. .. .. £
(e.) To repairs (generating-plant, &c.) .. £
(f.) To cost of transmission (including proportion of wages, section 2 (b)), repairs, &c. .. .. .. .. £
(g.) To cost of distribution (including proportion of wages, section 2 (c)), repairs, &c. .. .. .. .. £
(h.) To public (street) lighting—maintenance and lamp renewals (including proportion of wages, section 2 (c)) .. £
(i.) To operation of standby plant (if any) .. £
Total operating expenditure (section 29) £ -
Miscellaneous expenditure for year—
(a.) To cost of management (including salaries, section 2 (a), office expenses, &c.): .. .. .. .. £
(b.) Insurance, buildings, plant, accident, &c. £
(c.) Other expenditure (if any) .. .. £
(d.) Losses from sale of supplies, wiring, fittings, and repairs .. .. £
Total miscellaneous expenditure (section 30) .. £ -
Total working-expenses—
(a.) Total of sections 29 and 30 .. .. £
(b.) Average cost per (section 31 (a)) Pence:
unit sold section 23
(c.) Average cost per kilowatt of maximum load (section 31 (a)) .. £
section 20 -
Capital charges, &c., for year—
(a.) Paid to interest account .. .. £
(b.) Paid sinking fund or loan repayment account .. .. .. .. £
(c.) Paid depreciation reserve account .. £
(d.) Paid renewal funds account .. .. £
(e.) Paid reserve account .. .. £
(f.) Special capital charges (if any) .. £
(Capital outlay not to be shown here.)
Total capital charges (section 32) .. £
(g.) Average capital charge per unit sold (section 32 total) .. Pence:
section 23
(h.) Average capital charge per kilowatt of maximum load (section 32 total) .. £
section 20
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1926, No 36
NZLII —
NZ Gazette 1926, No 36
✨ LLM interpretation of page content
🏗️
Electric Supply Authority Details
(continued from previous page)
🏗️ Infrastructure & Public WorksElectric Supply, Census, Establishment Details, Technical and Commercial Data