✨ Schedule for Ironmongery Rates
1702
THE NEW ZEALAND GAZETTE.
[No. 67
| No. | Description of Article. | Rate. | Per |
|---|---|---|---|
| Auckland. | |||
| £ s. d. | |||
| Wellington. | |||
| £ s. d. | |||
| Christchurch. | |||
| £ s. d. | |||
| Dunedin. | |||
| £ s. d. | |||
| 152 | SCHEDULE FOR IRONMONGERY—continued. | ||
| Cocks, gun-metal, steam, plug, bib, or otherwise, screwed,} 1½in. | 0 10 0 | each. | |
| male, or female, as required} | |||
| 153 | " " " " " " " 1½in. | 0 12 0 | " |
| 154 | " " " " " " " 1¾in. | 0 16 0 | " |
| 155 | " " " " " " " 2in. | 1 0 0 | " |
| 156 | Cotter pins, per cent. discount from Nettlefold’s list | 50% | " |
| 157 | Copper, bar .. | 4 5 0 | cwt. |
| 158 | " ingot .. | 3 5 0 | " |
| 159 | " pipe, brazed .. | 6 10 0 | " |
| 160 | " " solid drawn .. | 8 0 0 | " |
| 161 | " sheet, up to ¼in. thick | 5 10 0 | " |
| 162 | Crucibles, plumbago, Morgan’s | 0 0 3 | No. |
| 163 | Currycombs .. | 0 3 0 | doz. |
| 164 | Dusters, Turkish, to sample .. | 0 7 0 | " |
| 165 | " feather .. | 0 1 6 | each. |
| 166 | Dust-pans, strong, japanned .. | 0 1 3 | " |
| 167 | Emery cloth, Oakey’s, all numbers | 1 10 0 | ream. |
| 168 | " powder .. | 0 0 3½ | lb. |
| 169 | Fire-clay, English .. | 0 9 6 | cwt. |
| 170 | Fire-bricks, “Glenboig” | 10 0 0 | 1000. |
| 171 | Felt, roofing .. | 0 0 5 | yard. |
| 172 | " saddlers’, to sample .. | 0 2 7 | " |
| 173 | " boiler, dry hair, 16oz. sheets, 32in. x 20in. | 0 0 9 | sheet. |
| 174 | " " 24oz. " | 0 0 10 | " |
| 175 | " " 32oz. " | 0 1 0 | " |
| 176 | " " 40oz. " | 0 1 3 | " |
| 177 | " " 48oz. " | 0 1 4 | " |
| 178 | Fenders, medium quality, to sample .. | 0 2 0 | foot. |
| 179 | Fire-irons, steel, bright, plain heads, to sample.. | 0 5 0 | set. |
| 180 | Files and rasps, all descriptions, per cent. disct. from Sheffield list | 45% | " |
| 181 | " " " " adv. on Stubs’ Lan’shire list | 10% | " |
| 182 | File card-wire .. | 0 1 0 | sq. foot. |
| 183 | Filters, Cheavin’s, No. 0 .. | 1 0 0 | each. |
| 184 | " " No. 1 .. | 1 10 0 | " |
| 185 | " " No. 2 .. | 2 0 0 | " |
| 186 | Fuse, Bickford’s, double tape .. | 0 0 8 | coil. |
| 187 | Figures, steel, ⅛in. .. | 0 1 0 | set. |
| 188 | " " ¼in. .. | 0 3 6 | " |
| 189 | " " ⅜in. .. | 0 3 9 | " |
| 190 | " " ½in. .. | 0 7 0 | " |
| 191 | Flannel, scouring .. | 0 0 8 | yard. |
| 192 | Forks, digging, American, 5-pronged .. | 0 3 6 | each. |
| 193 | " hay " 2- or 3-pronged, as required .. | 0 1 6 | " |
| 194 | Gas, pipe compo., ⅜in. and ¼in. | 0 0 2¾ | lb. |
| 195 | " burners, patent Steatite, to pattern | 0 0 9 | doz. |
| 196 | " " Bray’s .. | 0 0 9 | " |
| 197 | " globes, plain, to pattern .. | 0 1 3 | each. |
| 198 | " " ground " | 0 1 3 | " |
| 199 | " " opal " | 0 1 9 | " |
| 200 | " tongs .. | 0 1 10 | pair. |
| 201 | Glasses, gauge, Tomey and Sons’ | 0 6 6 | doz. |
| 202 | Glass paper, Oakey’s, all numbers | 0 17 6 | ream. |
| 203 | Glaziers’ putty knives .. | 0 0 7 | each. |
| 204 | " palette " | 0 0 9 | " |
| 205 | " diamonds, for sheet glass | 0 15 0 | " |
| 206 | " " for plate glass | 1 0 0 | " |
| 207 | Glue, pale, No. 1 .. | 0 0 7½ | lb. |
| 208 | " Russian .. | 0 0 9 | " |
| 209 | Grindstones to 24in. diameter | 0 0 3½ | lin. dia. |
| 210 | " above 24in. diameter and not exceeding 48in. | 0 1 0 | " |
| 211 | " 48in. " 60in. | 0 1 9 | " |
| 212 | " mountings, American " | 0 2 6 | set. |
| 213 | Grates, register, fine cast .. | 0 0 5 | inch. |
| 214 | " " 2nd-finish .. | 0 0 8 | " |
| 215 | " " with steel bead .. | 0 1 0 | " |
| 216 | Gas pipe and fittings, black, per cent. discount from list | 65% | " |
| 217 | " " galvanized, per cent. discount from list | 55% | " |
| 218 | Gimp pins, all colours .. | 0 0 8 | lb. |
| 219 | Hammers, claw, American, adze-eye, Cheney’s, No. 5 .. | 0 2 3 | each. |
| 220 | " engineers’, all steel .. | 0 1 2 | lb. |
| 221 | " smiths’, hand and sledge, steel-faced, all descriptions.. | 0 0 4 | " |
| 222 | Handles, hickory, adze .. | 0 10 0 | doz. |
| 223 | " " axe .. | 0 7 6 | " |
| 224 | " " hand hammer .. | 0 4 0 | " |
| 225 | " " sledge .. | 0 8 0 | " |
| 226 | " " pick .. | 0 9 0 | " |
| 227 | " " tomahawk .. | 0 2 0 | " |
| 228 | " file, ferruled .. | 0 1 0 | " |
| 229 | " broom .. | 0 2 0 | " |
| 230 | " mop, ferruled .. | 0 3 3 | " |
| 231 | " scythe, American .. | 1 10 0 | " |
| 232 | " shovel, long, American .. | 0 7 0 | " |
| 233 | " hay-fork, American .. | 0 5 0 | " |
| 234 | " hay-rake " | 0 5 0 | " |
| 235 | " spade and shovel, Ds .. | 0 10 0 | " |
| 236 | Hasps and staples, to drive .. | 0 0 3 | lb. |
| 237 | " " on plate .. | 0 5 0 | doz. |
| 238 | Hinges, brass butt, 1½in. .. | 0 0 2½ | pair, |
Next Page →
✨ LLM interpretation of page content
🏭
Schedule for Ironmongery Rates
(continued from previous page)
🏭 Trade, Customs & Industry23 December 1886
Tender, Rates, Ironmongery, Supplies, Auckland, Wellington, Christchurch, Dunedin
🏭
Schedule for Ironmongery Rates
(continued from previous page)
🏭 Trade, Customs & Industry23 December 1886
Tender, Rates, Ironmongery, Supplies, Auckland, Wellington, Christchurch, Dunedin
NZ Gazette 1886, No 67