WORKS TO BE UNDERTAKEN BY THE PROVINCIAL GOVERNMENT.
£ s. d.
West Coast Road, Pack-horse Track to Teramakan Saddle, including a Survey
3,000 0 0
Commission and Survey for Rakaia Bridge
200 0 0
New Ferry—Moorings, Rope, &c.
800 0 0
Avon Clearing
1,500 0 0
Pass Hill Bridge, £2,100; half to be subscribed by Mr. Kenrick
600 0 0
Approaches
150 0 0
Commission and Survey for Timaru Roadstead
200 0 0
Survey and Preparation of Plans for defence of Waimakariri Banks
150 0 0
6,600 0 0
VOTES FOR THE DIFFERENT DISTRICTS:
SEFTON DISTRICT.
£ s. d.
North Road, Ashley to Kowai, Forming and Metalling
350 0 0
Kowai to Waipara, Forming and Culverts
700 0 0
Entrance to Pass, Partial Forming
300 0 0
Weka Pass, Metalling
700 0 0
Waikari Bridge
200 0 0
Rangiora Ford Road, Metalling
500 0 0
Amesbury ditto, Forming and Metalling
500 0 0
Leithfield to Mount Grey Partial Forming
300 0 0
Sundry Roads and Drains
700 0 0
Road to Upper Ashley District
100 0 0
4,350 0 0
OXFORD DISTRICT.
£ s. d.
Oxford Road—Forming and Metalling
700 0 0
Mill Road—Forming and Metalling and Culverts
500 0 0
Sundry Roads and Drains
100 0 0
1,300 0 0
RANGIORA DISTRICT.
£ s. d.
Rangiora Direct Road
500 0 0
Oxford Road—Forming and Metalling
400 0 0
Mount Grey Road to Ashley—Metalling
300 0 0
Sundry Roads, Culverts, &c.
200 0 0
1,400 0 0
TOWN OF KAIAPOI.
£ s. d.
Grant to the Town
500 0 0
Carried forward
82,780 7 7
Note.—The works named for each district are only intended to show how the total sum is arrived at, and not to bind the Road Boards except within the limits of the total sum proposed.