Mining Regulations and Forms




SCHEDULE G. (a).

Certificate of permission to make a road or tramway, or divert a road.

I hereby certify that ... having complied with the regulations in force within the Thames Gold Fields, has received permission to form a public or private road, or tramway, or divert a road from ... to ... of the length of ... yards or thereabouts, and the proposed width is ... feet, and is required for [here state the reason for making same] it passes through the Claims undermentioned [if any] situate at ... Block, [Here insert claims through which road or tramway passes.]

Signature of applicants
Nos. of Miners’ Rights

Any person having any objection to this application must lodge the same in writing at the Warden’s office at ... within fourteen days from the date hereof.

Date ... Warden.


SCHEDULE I. (a).

Certificate for Residence or Business site.

No. ... I hereby certify that ... having complied with the regulations in force within the Thames Gold Fields, has received permission to occupy for residence or business ... feet by ... feet selected at ... Block ... test by ... feet.

Dated at ... this ... day of ... 186 ... Warden.


SCHEDULE I. (b).

Application to register a Residence or Business site.

To the Warden at ... Block ... 186

I hereby give notice that I desire to register my residence or business site at ... feet by ... feet for a period of ... days or months, area ... feet by test.

Signature of Applicant,
No. of Miner’s Right.


SCHEDULE I. (c).

Certificate of Registration of Residence or Business site.

No. ...

I certify that the residence or business site held by ... at ... Block ... feet by ... feet, is registered for a period of ... days or months from the date hereof.

Dated at ... the ... day of ... 186 ... Warden.


SCHEDULE H.

Application for protection of claim.

No. ... Block ...

To the Warden at ...

I hereby give notice that I desire to obtain a Protection Certificate for ... days or months for my (or our) claim, situate at ... true Block and the following particulars are true in all respects.

  1. Classification of claim and area.
  2. Date at which occupation commenced.
  3. Time during which the claim has been worked from ... day of ... 186 to ... day of ... 186.
  4. This claim has or has not been protected before.
  5. Reason of previous protection.
  6. Cause for which protection is now required.

Signature of applicant or applicants, ...

Certificate of Protection.

No. ...

I hereby certify that ... having complied with the Regulations in force within the Thames Gold Fields, the claim as above described is protected for the period of ... days or months terminating on the ... day of ... 186 ...

Warden.

N.B. A copy of this Notice and Certificate must be posted on the claim during protection.


SCHEDULE I.

Application for Residence or Building Site.

To the Warden at ... Block ... 186

I hereby give notice that I desire to occupy, for Residence or Business, ... feet by ... feet by ... and that I have this day marked the corners of such land with [posts or branches] in conformity with the regulations hereon made and provided.

Signature of Applicant,
No. of Miner’s Right

Any person having any objection to this application must lodge the same in writing at the Warden’s office at ... within fourteen days from the date hereof.

Date ... Warden.


SCHEDULE J.

Application to form a Water Race.

To the Warden at ... Block ... 186

I hereby give notice that I desire to construct a Water Race for mining purposes, commencing at a point ... The length of such Race is ... or thereabouts, and its intended course and breadth of such Race is ... and it is capable of carrying ... sluice heads of water.

Signature of Applicant
No. of Miner’s Right

Any person having any objection to this application must lodge the same in writing at the Warden’s Office at ... within fourteen days from the date hereof.

Date ... Warden.


SCHEDULE J. (a).

Certificate of permission to construct a Water Race.

No. ...

I hereby certify that ... having complied with the Regulations in force within the Thames Gold Field, has received permission to construct a Water Race capable of conveying sluice heads of water from the stream to his Claim [or machine site], situated at ... Block ... test by ...

Dated at ... this ... day of ... 186 ... Warden.


SCHEDULE K.

Application to form a Tail Race.

To the Warden at ... Block ... 186

I hereby give notice that I desire to construct a Tail Race for mining purposes, commencing at ... and terminating ... The length of such Race is ... or thereabouts.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF Auckland Provincial Gazette 1868, No 20





✨ LLM interpretation of page content

🌾 Certificate of Permission for Road or Tramway

🌾 Primary Industries & Resources
Road, Tramway, Mining, Thames Gold Fields, Application
  • Warden

🌾 Certificate for Residence or Business Site

🌾 Primary Industries & Resources
Residence, Business Site, Mining, Thames Gold Fields
  • Warden

🌾 Application to Register a Residence or Business Site

🌾 Primary Industries & Resources
Residence, Business Site, Registration, Mining, Thames Gold Fields

🌾 Certificate of Registration of Residence or Business Site

🌾 Primary Industries & Resources
Residence, Business Site, Registration, Mining, Thames Gold Fields
  • Warden

🌾 Application for Protection of Claim

🌾 Primary Industries & Resources
Claim, Protection, Mining, Thames Gold Fields
  • Warden

🌾 Application for Residence or Building Site

🌾 Primary Industries & Resources
Residence, Building Site, Mining, Thames Gold Fields
  • Warden

🌾 Application to Form a Water Race

🌾 Primary Industries & Resources
Water Race, Mining, Thames Gold Fields
  • Warden

🌾 Certificate of Permission to Construct a Water Race

🌾 Primary Industries & Resources
Water Race, Mining, Thames Gold Fields
  • Warden

🌾 Application to Form a Tail Race

🌾 Primary Industries & Resources
Tail Race, Mining, Thames Gold Fields
  • Warden